My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00442
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00442
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:26:04 PM
Creation date
10/11/2006 9:46:07 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1981
Author
USDOI
Title
25th Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Allocation and Repayments <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />.. <br /> <br />l <br /> <br />~ <br />> <br />I <br />! ., <br />. <br />t <br /> <br />"" <br /> <br />'.... <br />:.....4.;.. <br />... "'-, <br />--- <br /> <br />f"'-""''Ql1'" <br /> <br />,~ <br /> <br />c <br /> <br />Allocation of Federal <br />Investment <br /> <br />A preliminary allocatIOn of tolal estimated <br />costs of all authorized projects is sum- <br />marized in this table. <br /> <br />Allocations to the various purposes <br />authorized under Reclamation law are <br />required by Sec. 6 of Public law 84-485, <br />the Colorado River Storage Project Act, <br />excluding specific lish and wildlife and <br />recreation expenditures authorized by <br />Sec. 8 of this act. Fmal allocation reports <br />have been prepared on the Colorado River <br />Storage ProJect. and on Emery County. <br />Florida. Paoma. Seedskadee. Silt. and <br />Smith Fork Participating ProJeclS. and the <br />Vernal Unit 01 the Central Utah ProJect. <br /> <br />26 <br /> <br />- <br /> <br />I j~J <br /> <br />. <br /> <br /> <br />. <br /> <br />'" ".'W' 'n .~I, ';lIP <br />Project Costs Allocated fTnousands <br />(Excludes Section 8 Costs) oIOolla'$) <br />Reimbursable Allocations <br />Irrigation $1,887,721 <br />Power 1.193.322 <br />MuniCipal and InduSlnal Water B3J,91J <br />Otller 3.582 <br />Total $3.919.539 <br />Nonreimbursable Allocations: <br />Flood Control $ J9.22<1 <br />FlshandWildille 312.096 <br />ReCreallOn 7.198 <br />Road Relocation CoslS 25.2J7 <br />Cull ural Resources Activities 26.165 <br />Salelye! Dams 11,428 <br />Total $ 431.358 <br />01het <br />NavalO Indian Imgahon PrOJ('CT' $ 611,9<12 <br />Total Costs Allocated $4.962839 <br />Section 8 COSTS <br />FiSh and Wildlife $ 134717 <br />ReCfeahon 150.303 <br />TOlal CoSIS Now Allocaled $ 285.020 <br />Total S5.247859 <br /> <br />"<<,..~,g,,,,,,st,\,':1gnC<'I' ;'''~'<<:''O'~~.C'O'. <br />'~32 ,~, S1O' ',(.;. <br />
The URL can be used to link to this page
Your browser does not support the video tag.