My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00442
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00442
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:26:04 PM
Creation date
10/11/2006 9:46:07 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1981
Author
USDOI
Title
25th Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Recreation <br /> <br />. <br /> <br />~ <br />~-- <br /> <br />, <br /> <br />- <br />'- <br />~.~ <br /> <br />/ <br /> <br />. <br /> <br />()(:lPn'r><JrJ.woll"n,no S"~"O(.'.vR,";;',v <br /> <br />Operations: The Bureau of ReclamatIon <br />administered recreation facilities at two <br />Colorado River Storage PrOject reservoirs_ <br />Temporary facilities are administered at <br />Soldier Creek ReservOir during the years <br />the reservoir is lilling_ Construction of <br />permanent recreation facilities began at <br />Soldier Creek In 1979. and will continue <br />through the completion of Phase I deveJ. <br />opment. SOldier Creek is operated by the <br />Utah Projects Office In Provo. Utah. Fon. <br />lenel1e ReserVOir. of the Seedskadee <br />Project in Wyoming. IS administered by <br />the Flaming Gorge Office in Dutch John. <br />Utah. <br /> <br />Recreation Planning: Recreation planning <br />lor prOjects under feaslbillly Investiga. <br />tlons Included the Dominguez Project. <br />Glen Canyon and Flaming Gorge Peaking <br />Power ProJect, and Diamond Fork of the <br />Bonneville Unit, Central Utah Project. <br /> <br />Detailed site planning. deSign, and prepa. <br />ration of contract speCIfications con. <br />tinued on MCPhee Reservoir, DOlores <br />Project: NavajO Talfwater Area: Ridgway <br />ReservOir. Dallas Pro/ect; and the en. <br />larged Strawberry Reservoir and Red <br />Fleet Reservoir. Central Utah PrOJect. <br /> <br />t6 <br /> <br />~ <br /> <br />~ <br /> <br />:l' <br /> <br />= <br /> <br />-~ <br />-- <br />,~.. <br /> <br />- <br /> <br />- <br /> <br />~ <br /> <br />Recreation Construction: During fiscal <br />year 1981. Construction of recreation <br />facilities was initiated or completed at a <br />number of storage Units and participating <br />projects_ <br /> <br />Wayne N. Aspinall Unit, Colorado: Con. <br />structlon 01 recreatIon faCilities continued <br />at the Elk Creek. lola. and Riverine area at <br />Blue Mesa ReservOir. Camping. piCnick. <br />ing. and administrative facilities are under <br />construction at Cimarron. Morrow Point <br />ReservOIr. Several trails and day use <br />facilities have been completed at Morrow <br />POint and Crystal ReservOlrs_ <br /> <br />Bostwick Park Project. Colorado: Con. <br />struction of facilities conlmued at Silver <br />Jack ReservOir with plans being made by <br />the Forest Service for an August 1982 <br />opening dedication. <br /> <br />Navajo Unit. New Mexico: A contract was <br />awarded In September lor the develop- <br />ment of facilities In the NavajO Tailwater <br />Area. <br /> <br />I <br /> <br />I <br />I <br /> <br />" <br /> <br />" <br /> <br />1 <br />I <br /> <br />~.~"'-~-.--~ <br />~......,.,. ,.,'~-.;.- <br />*~~"'-':';"""~".'c <br />-::-:-:::'~,",:ii::1..!:t,2il .""... _..,;,.. <br />, -"""'~j'':'<'~'"'''' <br /> <br />~.. <br /> <br /> <br />!\.l'''''l r-.."'~")l ,.. <br /> <br />Central Utah Project, Utah: Bonneville <br />Unit, Current Creek - Construction 01 <br />recreational and administrative lacilitles <br />was completed with the YACC program <br />assisting In much of the development. <br /> <br />Bonneville Unit. SOldier Creek - Aspen <br />Grove Campground was completed_ All 01 <br />the development at Soldier Creek Slle was <br />completed With the exception of the <br />tables. grills. shelters. barrier posls. elc. <br /> <br />Bonneville Uni!. Strawberry - Work on <br />the main access road and boat ramp was <br />46 percent complete. A new contract 101 <br />constructIOn of all circulatory roads. park. <br />Ing. structures. and utilities was awarded <br />In September. <br /> <br />Jensen Unl!. Red Fleet - A contract lor <br />paving of the mam access road and con. <br />struction of recreational facilities was <br />awarded In June with one'hall of the job <br />completed by the end 01 the fiscal year. <br /> <br />Lyman Project. Utah and Wyoming: <br />Campground construction was completed <br />at both Statellne and Meeks Cabm Reser. <br />VOlrs. Both areas were opened 10 recrea- <br />lion use shortly alter the 4th 01 July. <br />
The URL can be used to link to this page
Your browser does not support the video tag.