My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00427
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:25:58 PM
Creation date
10/11/2006 9:45:40 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8549
Description
Misc. Small Projects and Project Studies
Basin
Rio Grande
Water Division
3
Date
6/24/1970
Title
Summary of the Norton Drain Project - Prepared for the Rio Grande Water Conservation District
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />"."- <br /> <br />4 <br /> <br />'; \ <br /> <br />, <br /> <br />~" ' <br /> <br />.' 0 <br />':\1 <br />."~ <br />('\J <br />c...J <br />~) <br /> <br />"" <br /> <br />.. ,,~'".c <br /> <br />SUl~~RY OF CONSTRUCTION COSTS <br />NORTON DR~IN PROJECT <br /> <br />~ Description Quanti t;jT Unit Unit Cost EJltllnsion <br />1 Excava tion 362,850 c.y. 0.25 90,712.50 <br />2 Drop atl'ucture, 21," 2 each 1000.00 2,000.00 <br />3 Drop structure, 48" Ii each 2300.00 9,200.00 <br />4 Check structure, !j,8" 2 each 2/"00.00 4,800.00 <br />5 Highway crossing 1 l.a. 11800.00 11,800.00 <br />6 Reiuforced concrete 13.2 c.y, 100.00 1,320.00 <br />7 Ri pra l' 1,082 .c,Yo 10.00 10,820.00 <br />8 48" CHI' culverts 1,506 1.:f. 15.00 22,590.00 <br />9 2/." CMI' cuI verts 612 1.1. 8.00 11,896.00 <br />10 18" steel pipe 271 1.1'. 9.50 2,574.50 <br />12 24" steel pipe 373 l,f. 10.00 3,730.00 <br />1/1 18" cutoff collars 4 pair 70.00 280.00 <br />16 24" cutoff collars iJ pair 70.00 280.00 <br />18 \vell protection 2 1.B, 1000.00 2,000.00 <br />19 450 hend, 48" CHP 1 each 300.00 300.00 <br />20 uio bend, 118" Cill' 1 each 175.00 175.00 <br />21 600 bend, 48" CHI' 2 each 337.50 675.00 <br />22 12" CMF field drops 48 each 270.00 12,960.00 <br />23 12" CHI' vert h,"Y drops 2 each 100.00 200.00 <br />21, 12" CMF ext to field dropa z.2!j, l.f. 6:00 2,544.00 <br /> CONSTRUCTION TOTAL $ 176,857.00 <br /> Administrative coats 3,000.00 <br /> Legal costs 2,638.00 <br /> Engineering costa 18,862.00 <br /> PROJECT TO",AL $ 201,357.00 <br /> <br />Financial participation in this project is divided as follows: <br />Agricultural Stabilization & Conservation Service 69.03% <br />Colorado !vater Conservation Board 22.35 <br />Rio Grande Water Conservation District ' 8.62 <br /> <br />PIIOJEC'l' TOTAL 100.00% <br /> <br />$ 139,000.00 <br />45,000.00 <br /> <br />17 ,357.00 <br />$ 201,357.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.