My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00416
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00416
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:25:54 PM
Creation date
10/11/2006 9:44:27 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Report
Basin
Colorado Mainstem
Date
12/22/1997
Author
UCRBRIP
Title
1997 Annual Reports Package Part 1
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />COLORADO RIVER RECOVERY PROGRAM <br />FY 97 ANNUAL PROJECT REPORT <br /> <br />RECOVERY PROGRAM <br />PROJECT NUMBER: CAP 'Ie. <br /> <br />I. Project Title: Operate Gunnison River gage below Redlands Diversion Dam <br /> <br />II. Principallnvestigator(s): <br />Rocky Dial, RDial@uc.usbr.gov, (970) 248-0656 <br />FAX: (970)248-0601 <br />Bureau of Reclamation <br />PO Box 60340 <br />Grand Junction, CO 81506 <br /> <br />III. Project Summary: <br />The gage was operational during the period. Funding from this Scope of Work was also <br />used to install and calibrate the Redlands Fish ladder flow measurement instruments. At <br />the end of the season the instruments were removed for security purposes and to <br />perform any necessary maintenance. <br /> <br />IV. Study Schedule: Annual <br /> <br />V. Relationship to RIPRAP: <br />-Colorado River Action Plan: Gunnison River <br />II.B.1.e. Identify and secure minimum flows below Redlands Diversion Dam <br /> <br />VI. Accomplishment of FY 97 Tasks and Deliverables, Discussion of Initial Findings and <br />Shortcomings: <br /> <br />None. <br /> <br />VII. Recommendations: Continue operation of the gage as long as the Recovery Program <br />has a need. <br /> <br />VIII. Project Status: <br /> <br />IX. FY 97 Budget <br /> <br />A. Funds Provided: $9,700 <br />B. Funds Expended: $9,700 <br />C. Difference: <br />D. Recovery Program funds spent for publication charges: None. <br /> <br />X. Status of Data Submission (Where applicable): <br /> <br />XI. Signed: Bob Norman <br />For Principal Investigator <br /> <br />12/10/97 <br />Date <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.