Laserfiche WebLink
<br />L-' f' C ' <br />'U:J't <br /> <br />APPENDED MATERIAL <br /> <br />Memorandum, Detailed Feasibility Study, Narrows Dam, Narrows Unit, <br />August 30, 1976. <br /> <br />" <br /> <br />Narrows Dam Briefing. <br /> <br />. <br /> <br />Narrows Review Meeting, <br /> <br />Geologic Data Furnished Narrows Dam Consulting Panel for Review of <br />Stability Analysis, Narrows Dam, <br /> <br />List of Materials given to Independent Panel, December 5, 1977, <br /> <br />Memorandum, Notes on the Ora] Presentation Made by the Narrows Dam <br />Safety Review Panel at a Meeting on January la, 1978, February 7, 1978. <br /> <br />Letter, Howard A. Coombs, Consultant, Safety Review of Preliminary Design <br />for Proposed Narrows Dam, Narrows Unit, <br /> <br />Letter, Thomas M. Leps, Consulting Civil Engineer, Safety Review of <br />Preliminary Design for Proposed Narrows Dam, Narrows Unit, January 28, <br />1978, <br /> <br />Letter, George F, Sowers, Consultant, Review of Preliminary Design for <br />Proposed Narrows Dam, Narrows Unit, February 8, 1978. <br />