My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00401
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:25:50 PM
Creation date
10/11/2006 9:43:11 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.400
Description
Narrows Unit - Reports
State
CO
Basin
South Platte
Water Division
1
Date
2/1/1978
Author
US DoI BoR
Title
Special Report Investigation of Review Issues Narrows Unit Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. ,..~ .::1 <br />\jt, .' <br /> <br />Table 5.--Total dissolved solids diverted to irrigated <br />lands below Narrows Dam site <br /> <br />28-Year mean Quantity Quality <br />(1947-1974) 1,000 ac-ft mgl1 1,000 tons <br />January 0 1245 0 <br />February 0 1264 0 <br />March 0 1236 0 <br />April 16.2 1056 23.2 <br />May 42.7 908 52.7 <br />June 60.4 815 66.9 <br />July 75.8 968 99.7 <br />August 73.2 1183 117.7 <br />September 58.4 1212 96.2 <br />October 19.6 1257 33.5 <br />November 0 1252 0 <br />December 0 1269 0 <br />Annual diversion 346.3 1041 489.9 <br />ac-ft = acre-feet <br />mgll - milligram per liter <br /> <br />Cost Estimates <br /> <br />New Faci liti es <br /> <br />A cost estimate for new facilities required in the test areas was <br />prepared and that estimate was then increased proportionately to <br />calculate the cost of the entire recharge system. <br /> <br />Diversion points on the South Platte River were selected and canal s <br />were layed out on 7l;; minute USGS topographic maps. Recharge ponds <br />were located along the canals to distribute water evenly throughout the <br />potential recharge area. Canal capacities were determined based on <br />diverting the annual recharge requirement in a 30-day period, Canals <br />would be earthlined from the diversion points to the recharge areas <br />and unlined in the recharge areas. <br /> <br />49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.