Laserfiche WebLink
<br />- r, <br />()u21 <br /> <br />TABLE OF CONTENTS (continued) <br /> <br />Page <br /> <br />, <br /> <br />CHAPTER II--(continued) <br />Ground-Water Recharge (continued) <br />Potential Problems. . . . . . <br />Recharge Site Selection. . <br />Operation and Maintenance. <br />Water Quality. . . . . . . <br />Water Quality for Irrigation. <br />Cost Estimates. . . . . . . . <br />New Facilities. . . . . . <br />Rights-of-Way. . . . . . .. ..... <br />Operation. Maintenance. and Replacement. <br />Total Costs. . . . . . <br />Onfarm Costs . . . . . <br />Power . . . . . . . . <br />Economic Analysis . . . . <br />Benefit Determination. . . . <br />Irrigation Benefits Analysis <br />Pumping Investment and Costs <br />Project Costs. . . . . <br />Benefit-Cost Analysis. <br />Conclusions . . . . . . . <br />BIBLIOGRAPHY <br />APPENDED ~lA TERIAl <br /> <br />46 <br />46 <br />47 <br />48 <br />48 <br />49 <br />49 <br />50 <br />50 <br />51 <br />51 <br />52 <br />52 <br />52 <br />52 <br />53 <br />53 <br />54 <br />55 <br /> <br />-, <br /> <br />_ _ _ _ _ _ _LISLOLTABLES_ __ __ <br /> <br />Number Title Paqe <br /> <br />1 Monthly streamflow changes. Platte River at <br /> <br />Overton. . . . . . . . . . . . . . . . . . 32 <br />2 Number of Whooping Cranes seen in Nebraska <br />(1949-1977). . . . . . . . . . . . . . . . 35 <br />3 Recharge and conveyance facility requirements <br />for the four test areas. . . . . . . . . . . 43 <br />4 Recharge and conveyance facility requirements <br />for three recharge alternatives in the <br />South Platte study area. . . . . . . . . . 45 <br />5 Total dissolved solids diverted to irrigated <br />lands below Narrows Dam site. . . . . . . 49 <br />6 Ground-water recharge systems. . . . . . . . 51 <br />7 Benefit-cost analysis. . . . . . . . . . . . 54 <br />8 Comparison of ground-water alternative with <br />project. . . . . . . . . . . . . . . . . . 56 <br /> <br />iii <br />