My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00390
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00390
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:25:47 PM
Creation date
10/11/2006 9:42:42 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8277.500.20
Description
Uinta Basin Unit - Colorado River Water Quality Improvement Program
State
UT
Basin
Colorado Mainstem
Date
7/1/1981
Title
Uinta Basin Unit Status Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />FUTURE ACTIVITIES <br /> <br />. <br /> <br />The salinity contributions from the basin will be monitored through- <br />out continued planning and during and after construction to verify the <br />salinity reduction effected by implementation of the unit. <br /> <br />. <br /> <br /><. <br /> <br />Feasibility studies on Uinta Basin Unit are continuing. The plan <br />will be refined as plan formulation and evaluation continue. The Regional <br />Director's proposed feasibility report and draft environmental statement is <br />scheduled for review by other agencies during 1983. Following this review, <br />the feasibility report and final environmental statement can be completed <br />and the Secretary of the Interior could request authorization for construc- <br />tion. Under current schedules, the Secretary's report could be forwarded to <br />Congress in December 1985. <br /> <br />If, based on the Secretary's report, Congress authorizes the unit for <br />construction, advance planning studies will be conducted beginning in 1987. <br />Advance planning is expected to take about 2 years. During advance plan- <br />ning, costs and designs for the recommended plan would be refined and other <br />options would be considered if new studies prove other alternatives to be <br />more cost-effective. Operation, maintenance, and replacement contracts <br />would be negotiated and signed with the present water users to assure that <br />the new facilities would be operated and maintained efficiently. <br /> <br />Based on the schedule for these activities, construction on the Uinta <br />Basin Unit could begin in 1989. Construction would occur in stages and <br />would be completed in about 9 years. <br /> <br />" <br /> <br />i "l,- l ':' '" <br />, ,- - ., I v <br /> <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.