My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00383
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00383
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:25:44 PM
Creation date
10/11/2006 9:42:35 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.100
Description
Colorado Big Thompson Project - Project Description
State
CO
Basin
South Platte
Water Division
1
Date
1/5/1942
Author
RJ Tipton
Title
Analysis of Power Features of Colorado-Big Thompson Project with Recommended Construction Schedule
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table No. 8 <br /> <br />Sheot 2 of 2 She0ts <br /> <br />COLORAm - BIG THOr.PSON PROJErT <br /> <br />,~ <br />, C) <br />... <br /> <br />ESTIMATED COST OF DEP'Cc";;CIABLE ITElIS O? PO','ER Y";i.TURES <br /> <br />,\, <br /><.'1 <br /> <br />ESTI;~m1:D INCREASE IN COST OF DEPRECIABLE ITEMS OF <br />P()',.,'ER FR',TURES OF p.~:.laN(l PROJ'~CT OVER BASE LOAD PROJECT <br /> <br />.Power Ca.na1 No. lA, Inoreased Cost or' Power Can"l <br />No.1 to serve both Powor Pl~t No.1 and No, lA <br /> <br />Estimated Cost <br /> ,;1,342,000 <br />:411, g:JO <br />96,000 573 ,')00 <br />41l,050 411,050 <br />145,600 145,600 <br /> $2,472.550 <br />Call 2,473,000 <br /> <br />PO',\'ER PLi.NT NO. 1 <br />PWler Plant No.1, &dtohyard and Penstocks <br /> <br />PO:'IER PLANT ,NO. 1A <br />Power Plant No. lA, &vitchyo.rd and Ponstock <br /> <br />POWER PL\NT NO. 2 <br />Powor Pla.nt No.2, Switchyard and Penstock <br /> <br />TRANSMISSION ;.mJ SUBSTATIONS <br />Substations a.nd Switchya.rds <br /> <br />ESTI!.lATED TOTAL INCREASE IN COS1' OF DEF%';CLcDLE ITEMS <br /> <br />ESTHiATED TOTAL COST O}" DEPTIECLcBLE I'i'EKS OF po','/ER <br />FEATURES OF BASE LOAD PROJECT <br /> <br />)8,200,000 <br /> <br />ESTIIlATED TOTAL COST OF DEPRECL,BLE !TEES OF PO':iER <br />FEATURES OF PEAKING PROJECT <br /> <br />.)10,673,000 <br /> <br />ESTI~~TED INCTIEAS~ DUE TO RISE IN PRICES SINCE ~ffi 14,1939 1,280,000 <br /> <br />ESTHlATED TOTuL COST OF DEPRi:CL\BLE ITEMS <br />OF PO'c','ER FEATURES, DEC4 1941 <br /> <br />,~1l,953,OOO <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.