<br />COLOR.;,DO - BIG THOMPSON PROJECT
<br />
<br />ESTn\~,TED A1rnu;~ OPE~~TION AND !L\INTEN;JlCE EXPENSE
<br />
<br />N
<br />W
<br />
<br />ESTn~,TEtJ ANNU;,L OPE1LTION AND M.\.lllTENlJlCE
<br />EXPENSE OF f'(TilER FEATURES OF B;,SE LOAD'PROJECT - (Continued)
<br />
<br />,/unount Brought FOI"'.'lflrd
<br />TRi.NSMISSION LINES AND SUBSTATIONS
<br />Trnnsmission Lino from powor Pl:mt No.1 to Gr':tnby
<br />Pumping Phnt (15 mi10s ovorh0ad, 13 mil"s co.Thle) $
<br />
<br />LJoIlUU"U I::: O~ l:;. UHO'.,) \Ie
<br />
<br />Esti~tod Exp0nso
<br />:~ 2GI3,OOO
<br />
<br />1,200
<br />
<br />Two Tro.nsmission Linos from Povror Pl"nt No. 1 to
<br />Vo.lmont (103 Circuit milos at ~125. por milo) '~,OOO
<br />
<br />Tro.nsmission Lino from Powor Pl'lnt No.4 to ,;rooloy
<br />(28.5 milos at ~125. per milo) ),600
<br />
<br />Tro.nsmission Lino from Powor PI,mt No. L~ to Nnrth
<br />Poudro Pumpin~ Plant (23 milos at ~60. por mila) 1,400
<br />
<br />Transmission Lino from powor Plant No. 5 to Gr~nby
<br />Pumping; Plnnt ::md from Powor Plant No.5 to Dillon
<br />(75 milos at ~125. per milo)
<br />
<br />Substations o.nd Switohynrds - 110 lev.
<br />
<br />.
<br />
<br />Substntions - 33 lev.
<br />
<br />ESTIMATED TOTAL "NNUAL OPl::RATION AND MAINTEN1JICE
<br />EXPENSE OF POWER FEAT1n,SS OF B:.SE LOAD PROJECT
<br />
<br />9.400
<br />36,300
<br />
<br />3.000
<br />
<br />67,70C
<br />
<br />355,700
<br />
<br />ESTIM:,TED INCRK.S;': IN .,.NliUi,L OPER;~l'IOH i...ilD MAINnN;JlCE EXP1WSE
<br />OF POWER FE;:~1JRE8 :W PEAKING PROJECT OVER B,iSE LOAD PRO.r";CT
<br />
<br />POWER PLANT NO. 1
<br />Powor Plf1n t No.1; Swi tohyo.rd and Ponstocks
<br />(C[tp,~ci ty Inerercsod from 30,000 )::111. to 60 ,000 kw.),'~ 14,400 ;l 11j,400
<br />
<br />POWER PLi,NT NO. 1A
<br />Powor Plnot No. lA, &"itchy~rd nnd Penstock
<br />(8,000 lGv. fit 03.00)
<br />Pov,~r Co.nal No. 11.. Incre~s() r:-f Powor Co.no,l lIo. 1
<br />to sorvo Powor Pl"nts No.1 find No. 11.
<br />Goneral Exponsu
<br />
<br />,L
<br />
<br />PO\rnR PUINT NO.2
<br />Power Plant No.2, Switchy"rd "nd Penstocks
<br />(Co.prccity Incroasod from 50,000 mv. to 56,000 l~.)
<br />
<br />,
<br />'.
<br />
<br />TRANSMISSION LINES AND SUBSTATIONS
<br />Subst~tions nod SwitchY8rds
<br />(Incrol:\sod Capo.ci ty o.t Mo.rJ,ct)
<br />
<br />ESTIMATED TOTAL INCR&iSE IN AJWUAL OPERATION AND
<br />MAINTENANCE EXPENSE OF POWER FEATURES
<br />
<br />ESTIMATED TOTAL ANNUAL OPE~iTION AND Mt.INTEN/JlCE
<br />EXPENSE OF POWER FEATURES OF PK,KHlGPROJECT
<br />
<br />24,000
<br />
<br />5,000
<br />1,600
<br />
<br />30,600
<br />
<br />3,200
<br />
<br />3,200
<br />
<br />6,100
<br />
<br />6,100
<br />
<br />4) 54,300