Laserfiche WebLink
<br />o <br />(":) <br />.... <br /> <br />tv <br />...... <br /> <br />COLORADO -.IATER CONSERVA'l'ION BOARD <br /> <br />SUPPLElIENT TO TABLE NO. 6 <br /> <br />COLClRAD(>ooBIG TEDMF5ON" PROJEcT <br />ESTIllATED .ADDITIONAL COST TO PROVIDE "PEAlCING BY EASTERN SLOPE PCl'lER PLANTS <br /> <br />ESTlllATED COST <br />Coat Total <br /> <br />(Totd Estimated. cost of' Projeot by United Ste.t~s Bureau of R,eab.mation. June 11. 1939) <br /> <br />POIIER CAIIAl. NO. lA <br />IDDreued cost of Pawer Canal No. 1 to serve both Power <br />Plant No. 1 IlIld POll8r PIllZLt No. lA. <br /> <br />8 177,000 <br /> <br />NEW PCllER PUNT NO. 1.A <br />Locatod at Kerya Lake between East Portal of Continsotal <br />Divide Twmel and Pawer Ple.nt No.1, about 3 miles S.W. <br />of Estee Park. P~t oapaoity 550 o.f.a. generating <br />8000 1.11. <br /> <br />8 708.000 <br /> <br />PO:tmAGE AT IlARYS LAXE <br />Struotu.rea to provide au.ffloient pondage &:t lIary. lake <br />to enable daily peaking at Fawer Plant No.1. <br /> <br />8 10S.000 <br /> <br />ADDITIONAL CAJl ACI 'I'Y FOR POWER PLANT NO. 1 <br />Plant oapaoity inoreased from 30,000 l.W, to 60.000 K.W. <br />to provide for daily peaking requir:8lllentlll. <br /> <br />tl.988,OOO <br /> <br />PONDAGE HELm PCWER PLANT NO. 1 <br />Struotures to prav1de eu!'f101ent pondage below Power Plant <br />No. 1 to enable daily paalting at PQ1Ier Plant No.. 2. <br /> <br />8 f!27 ,000 <br /> <br />ADDITIONAL CAPACITY FOR parlER PLANT NO. 2 <br />Plant capacity increased frcm SO,OOCl I.W. to 56,000 I.W. <br />to provide for daily peakmg requiremente. <br /> <br />. 573,000 <br /> <br />PONDAGE BELOO PO'iliR PLANT NO. 2 <br />Struoturu to provida euffioient ponde.ga belQ1f Power Pbnb <br />No.2 to ene..bl6 deJ..ly pee.k.in& ..to Power Plant. No.3. PIUlt <br />oapacity lnorOD.s6d fran. 50,000 K.W. to 56,000 X.W. <br /> <br />8 127.000 <br /> <br />MISCELLANEODS <br />Additional Cost of Transm18siCll:1 Lines. Subotationa e..ad <br />other :rniooe1laneouo items. <br /> <br />8 208,000 <br /> <br />JSTIYATED TOTAL COST OF PROJECT WI TH PROVISIONS FOR PONDAGE <br />AND PEAKING OF' AI.J.. PCWfRR PLMfTS TO MEET DAlLY LOAD REQUIRE- <br />MENTS, BUT YlITHOur ADDITIONAl. STORAGE ON EASTERN SLOPE. <br /> <br />ESTDlATED INCREASE DUB TO RISE IN PRICES SINCE JlJBE 11, 1939 <br /> <br />TOTAL BS'l'I1IU'ED COST OF PROJECt DECBllBER 19l.i1 <br /> <br />854.288,000 <br /> <br />8 4,113.000 <br /> <br />8S8,401,000 <br /> <br />8 6.599.000 <br /> <br />.65,000,000 <br /> <br />OSl-41-9160~ <br />Rovieed o.oember 1941 <br />