Laserfiche WebLink
<br />Co <br />c-::> <br />(") <br />.,.., <br />\...~, <br />-..:! <br />tv <br /> <br />APPENDIX <br /> <br />LIST OF TAELES <br /> <br />T"ble <br />No. 1 <br />No. 2 <br />No, 3 <br />No. 4 <br />No, 5 <br />No. 5A <br />No.6 <br /> <br />Title <br /> <br />Diversions through Continental Divide Tunnel <br /> <br />Big Thompsen Rivor Water Available for Power <br />by Eastern Slope Power Pl~nts <br /> <br />Net Energy Produotion by all Power Plants <br /> <br />Summary of Energy Production <br /> <br />Deficiencies in Energy Producti '1, below Sixty <br />Million Kilowatt-hours (per month) <br /> <br />Summary of Energy Production at all Eastol"n <br />Slope Power Plants <br /> <br />Description 'Of Principal Features of Project <br />with Estimated Cost" <br /> <br />No, ,7 <br /> <br />Esti~ated Anm,al Operation and Maintenance <br />Exponse 'Of Project <br /> <br />No.8 <br /> <br />Estimated Cost of Depreciable Items of Power <br />Features of Project <br /> <br />No.9 <br /> <br />Load and Supply Dahl for Power Systems tributary <br />to Colorado-Big Thompson Project <br /> <br />No. 10 <br /> <br />Contemplated Additions to Dependable Capacity <br />in HorthGrn Color9.do, Western N..brask9. and <br />Wyoming after January 1, 19L~ <br /> <br />, <br /> <br />No. lOA <br /> <br />Summary 0 f Net Assured Capacity "fter January 1, 1942 <br />