My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00383
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00383
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:25:44 PM
Creation date
10/11/2006 9:42:35 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.100
Description
Colorado Big Thompson Project - Project Description
State
CO
Basin
South Platte
Water Division
1
Date
1/5/1942
Author
RJ Tipton
Title
Analysis of Power Features of Colorado-Big Thompson Project with Recommended Construction Schedule
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-16- <br /> <br />o <br />o <br />(''") <br />CD <br />CO <br />W <br /> <br />ESTIMATED POSSIBLE TIME OF CmlPlETION OF PROJECT <br /> <br />The feature of the project which heretofore has been consider- <br /> <br />ed the one requiring too longest time to canplete is the Continental Di- <br /> <br />vide tunnel. On Deoember 31st 27,961 feet of t re tunnel had been driven. <br /> <br />This is 40% of the total length. If the work can proceed without inter- <br /> <br />ruption, and if excavation condi tions are no worse than have been en- <br /> <br />countered to date, the driving of the tunnel can be completed by the <br /> <br /> <br />middle of 194;. Drawing No. 91740 indicates actual progress on the <br /> <br />tunnel to date. Estimated progress is also shown, which indicates com- <br /> <br />pletion during 194;. <br /> <br />Green Mountain reservoir and power plant will be oompleted on <br />or before May, '194-;. Vari ous features sue h as roads, oamps, and trans.,. <br /> <br />mission lines have been finished. A contract hes been let for the con. <br /> <br />struction of the diversion tunnel for Granby reservoir; If sufficient <br /> <br />funds are made available it is estimated essential features for the <br /> <br />operation of the principal pOl'ler plants of tha project can be completed <br /> <br /> <br />by the end of the fi seal year' 1944 and that all pewer plants oan be <br /> <br /> <br />placed in operation by the end of the fiscal year 1945. <br /> <br />To insure the sucoessful operation of the power features of <br /> <br />the project, Granby reservoir, pumping plant and oanal, and Shadow <br /> <br />Mountain Lake, must be finished on or before the completion of the tunnel. <br /> <br />Granby reservoir is the principal regulating reservoir of the projeot. <br /> <br />It intercepts all the water tributary to it. The pumping plant whioh <br /> <br />is an essential part of t,he reservoir unit; pumps the water to Shadow <br /> <br />Mountain Lake from which it flows to the tunnel. Without Granby reser- <br /> <br />voir little firm energy can be generated by the project. This situation <br />
The URL can be used to link to this page
Your browser does not support the video tag.