My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00377
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00377
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:25:41 PM
Creation date
10/11/2006 9:42:28 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.128.A
Description
Silt Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/1/1945
Author
USDOI - BOR
Title
Silt Project-Colorado (Draft of Project Planning Report) Part 2 of 2
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C\J <br />c.o <br />N <br /> <br />Summary of water operation study for the 2,106 acres of prior <br /> <br />right land and 488 acres of land under the Davey Ditch, all to be <br /> <br />irrigated with water releases from the Rifle Gap Reservoir, is shown <br /> <br />in the following tablet i/1 lh... aA"d~ .r Ac 'G- ~.. f~ <br /> <br /> Ihm-oft <br /> Rifle Creek Ideal Demand Reservoir <br />Year Rifle Gap Reservoir 2,594 Acres Shortage Spill <br />1937 13.3 12.3 0 1.0 <br />1938 19.4 12.3 0 7.1 <br />1939 16..8 12.3 0 4.5 <br />1940 14.1 12.3 0 1.8 <br />1941 17.2 12.3 0 4.9 <br />1942 23.0 12.3 0 10.7 <br />1943 15.7 12.3 0 3.4 <br />Average 17.1 12.3 0 4.8 <br />, <br />The following schedule will show the decreed water.rights of <br />Rifle Creek: <br /> <br />~: ' <br /> <br />'"I <br /> <br />, <br />: I <br /> <br />1'.,' <br /> <br />;'i-i <br /> <br />:;;~ <br /> <br />'.,'?, <br /> <br />l.b <br />
The URL can be used to link to this page
Your browser does not support the video tag.