My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00351
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:25:33 PM
Creation date
10/11/2006 9:40:48 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
3/1/1965
Author
Unknown
Title
Quarterly Reports - Colorado-DOI - 1965
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />~~~~~\ <br /> <br />. <br /> <br />. <br /> <br />,. <br /> <br />PACIFIC SOUTHWEST INTER-AGENCY COMMITTEE <br />Quarterly Report for Colorado <br />65-1 Meeting <br /> <br />Construction <br /> <br />Work on Blue Mesa Dam, CURECANTI UNIT, is being con- <br />tinued on a reduced scale during the winter months, with the work <br />being concentrated on construction of the powerplant structure <br />and channel improvement for about 4,000 lineal feet below the dam- <br />site to give an extra foot or two of effective power head to the <br />turbines. It is expected that the dam embankment construction will <br />be completed by October, 1965. <br /> <br />On January 14 a $110,000 contract was awarded to Humphrey <br />Contracting Corporation of Wichita, Kansas, for clearing the Blue <br />Mesa Reservoir area. <br /> <br />About 17 percent of the work has been completed on Mor- <br />row Point Dam of the CURECANTI UNIT. The contractor is continuing <br />work on open cut excavation for the powerplant, the keyways and <br />the tunnel portals. Crews are in the process of installing a large <br />concrete batchplant for the 400,000 cubic yards of concrete that <br />will be placed in the 455-foot structure. Placing of concrete is <br />expected to begin in July. A great deal of rock bolting has been <br />required above the open cut areas. <br /> <br />At Crystal damsite of the CURECANTI UNIT, all core drill- <br />ing and borrow pit exploration has been completed by the Bureau of <br />Reclamation. Invitations to bid on the first contract for work <br />are scheduled for issuance in the near future. This contract will <br />be for construction of the difficult access road to the damsite. <br /> <br />At Rifle Gap Dam, principal feature of the SILT PROJECT, <br />the open cut excavation at the upstream portal of the outlet works <br />tunnel site is complete. Bids were opened on January 19 for cons- <br />truction of the a-mile-long Silt Pump Canal which will convey ir- <br />rigation water to lands on the lower portion of Harvey Mesa. <br /> <br />Feasibility Investigations and Reports <br /> <br />On the Dallas Creek project, the feasibility report is <br />in progress and is scheduled to be completed prior to July 1, 1965. <br />
The URL can be used to link to this page
Your browser does not support the video tag.