My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00330
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:47 PM
Creation date
10/11/2006 9:40:17 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
12/9/1980
Author
PSIAC
Title
Minutes of the 80-3 Meeting - December 9-10 1980
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />033156 <br /> <br />, <br /> <br />U. S, DEPARTMENT OF AGRICULTURE <br /> <br />Semi-Annual Report <br /> <br />Pacific Southwest Inter-Agency Committee <br /> <br />July 1, 1980 - December 31, 1980 <br /> <br />SOIL CONSERVATION SERVICE <br /> <br />RIVER BASIN PLANNING <br /> <br />ARIZONA: <br /> <br />General <br /> <br />The title of the planning staff has been changed from <br />River Basin-Watershed Planning Staff to Water Resources <br />Planning Staff, This change resulted from staff reorgani- <br />zation brought about by the formation of multi-state <br />planning staffs to handle watershed activities, River <br />Basin planning activities have not been changed, <br /> <br />Little Colorado River Basin Cooperative Study <br /> <br />The study involves the preparation of 12 working papers <br />and a summary report, All of the papers are essentially <br />completed except for Erosion and Sediment. A total of 35 <br />maps will be published, of which 34 have been completed, <br />The format of the final report has not been decided, <br />however, the individual working papers will probably be <br />published separately or in some combination instead of <br />one large volume, The completion of the study has been <br />delayed until spring, 1981, because of staff changes, <br /> <br />Colorado River Indian Reservation Cooperative Study <br /> <br />The collection of basic resource data and the soil survey <br />continues. <br /> <br />Data on the amount of irrigation water applied at 20 <br />on-farm weirs and recorder sites is being collected, <br />Weirs and recorders to measure project spills have been <br />installed at 30 spill sites, The Water Conservation Lab, <br />SEA, is using their digitizer and computer facilities to <br />compute the amount of water from the graphs, <br /> <br />Arizona State University has completed, under contract, <br />an inventory of recreational resources, <br /> <br />This study is currently authorized and funded as a Level B <br />Study, The Tribe has requested an implementaion study, <br />The possibilities of changing to a Level C Study are <br />being explored, <br /> <br />1 <br /> <br />C-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.