Laserfiche WebLink
<br />00297 ~. <br /> <br />~ <br /> <br /> <br />," ';,IJ-" ~~~ I <br />fjt7fi~ <br />"'''''.'''1 <br />~?~~.f~ <br />.:..::r.~:~;1 <br />~~.::~. .::.:; <br />.':.',..:..,-'1 <br /> <br />:.:i:] <br /> <br />Reservoir filled to the ma.ximum storage of record, 727,000 acre-feet, late in <br />May. Excess waters werc 8torcd in the e"clusive flood pool from late April <br />through the midcUe of July. <br /> <br />Guernsey Reservoi r was filled to the normed summer operating level by the end <br />of March, Release of water anticipated to be in cxcess of legal ownership was <br />started from Guernsey Rcservoir early in April. About 29, 000 acrc-feet of water <br />was transferred to the Inland Lakes during the latter part of April. <br /> <br />~t:>:'t: <br /> <br />". ...... <br /> <br />Releases from Guernsey Reservoir werc cut back sharply early in May to accom- <br />moclate heavy inflow below the reservoir especially Cram the Laramie River. <br />Releases thereafter until mid-July were scheduled as necessary for flood con- <br />trol purposes hy the Corps of Engincers. About 674,000 acre-feet of water was <br />released at Guernsey Reservoir in excess of the normal irrigation Tequirement. <br />The Omaha District, Corps of Engineers, indicates that the North Platte River <br />reservoir system above Guernscy Reservoir prevented flood damage estimated <br />at about $2, aDO, 000 during May and June 1971. <br /> <br />......;.... <br /> <br />~::i;.';:: <br /> <br />:,.:."..:0:"" <br />f:~::~::;:~:~: <br />...1 <br />~~~t~' <br />'.-..'....'1 <br />-~~. .,.-;.~' <br />;;;::::~// <br />:}:._~:::\;~! <br />;_::;~.::;<~;,:; <br />t;~~:jJ:~~ <br /> <br />f~jb~ <br /> <br />With exceptional water supply, the North Platte project storage water ownership <br />filled to capacity early in May and remained at 71 6, 000 acre-feet at the end of the <br />water year.. Delivery to the North Platte project water users was subnormal during <br />May and near normal thereafter. A total of 991, 000 acre-feet of water was deliv- <br />ered to the North Platte project users during the season. <br /> <br />~F:~~::~?~' <br />~I <br />;::;{:g:1 <br />,.," --.", <br />:.::'....::.-". <br /> <br />Glenda unit storage water ownership filled to capacity early in March and remained <br />at 167,000 acre-feet at the end of the water year. Delivery to Glenda unit water <br />users was 11,000 acre-feet during the season which was near normal. <br /> <br />Due to the exceptionally high inflow conditions, carryover storage in Glenda <br />Reservoir at the end of the water year was 128,000 acre-feet which was well <br />above normal. A carryover of 20,000 acre-feet of water in Guernsey Reservoir <br />was transferred to the Inland Lakes early in October. <br /> <br />~,;;;::'::, <br />.::.-,.;:;".;. <br /> <br />e:~i;i';: <br />flt~~' <br />!~;:"j,/:~"'~. <br />",:, .,:.... <br />:::; ~...;~:':. ,~~::. I <br /> <br />~~;~\::;;~ I <br /> <br /> <br />~.:~~.:~ <br />.. ~:"' <br /> <br />.."'1 <br />: ~ . <br /> <br />18 <br /> <br />"', . <br /> <br />... .".' -,' . ..~~ ~ <br />':~:.~.~:':.~ti:~~Y{;;;::'-Y:~~<,< ;':" .:.~;;~~~, :':;:~'?:::;.<:':~~:t:;':.:~:3i:,;:':,S~:5,;~;.~t1i?:[';~~!C~:};~~'i'::~~\~:<t:.:';);::"'(';, .,...:.:.. ~{5:~:tA:~,<:'...,.,~:.".':' <br />