<br />Reservoir filled to the ma.ximum storage of record, 727,000 acre-feet, late in
<br />May. Excess waters werc 8torcd in the e"clusive flood pool from late April
<br />through the midcUe of July.
<br />
<br />Guernsey Reservoi r was filled to the normed summer operating level by the end
<br />of March, Release of water anticipated to be in cxcess of legal ownership was
<br />started from Guernsey Rcservoir early in April. About 29, 000 acrc-feet of water
<br />was transferred to the Inland Lakes during the latter part of April.
<br />
<br />~t:>:'t:
<br />
<br />". ......
<br />
<br />Releases from Guernsey Reservoir werc cut back sharply early in May to accom-
<br />moclate heavy inflow below the reservoir especially Cram the Laramie River.
<br />Releases thereafter until mid-July were scheduled as necessary for flood con-
<br />trol purposes hy the Corps of Engincers. About 674,000 acre-feet of water was
<br />released at Guernsey Reservoir in excess of the normal irrigation Tequirement.
<br />The Omaha District, Corps of Engineers, indicates that the North Platte River
<br />reservoir system above Guernscy Reservoir prevented flood damage estimated
<br />at about $2, aDO, 000 during May and June 1971.
<br />
<br />......;....
<br />
<br />~::i;.';::
<br />
<br />:,.:."..:0:""
<br />f:~::~::;:~:~:
<br />...1
<br />~~~t~'
<br />'.-..'....'1
<br />-~~. .,.-;.~'
<br />;;;::::~//
<br />:}:._~:::\;~!
<br />;_::;~.::;<~;,:;
<br />t;~~:jJ:~~
<br />
<br />f~jb~
<br />
<br />With exceptional water supply, the North Platte project storage water ownership
<br />filled to capacity early in May and remained at 71 6, 000 acre-feet at the end of the
<br />water year.. Delivery to the North Platte project water users was subnormal during
<br />May and near normal thereafter. A total of 991, 000 acre-feet of water was deliv-
<br />ered to the North Platte project users during the season.
<br />
<br />~F:~~::~?~'
<br />~I
<br />;::;{:g:1
<br />,.," --.",
<br />:.::'....::.-".
<br />
<br />Glenda unit storage water ownership filled to capacity early in March and remained
<br />at 167,000 acre-feet at the end of the water year. Delivery to Glenda unit water
<br />users was 11,000 acre-feet during the season which was near normal.
<br />
<br />Due to the exceptionally high inflow conditions, carryover storage in Glenda
<br />Reservoir at the end of the water year was 128,000 acre-feet which was well
<br />above normal. A carryover of 20,000 acre-feet of water in Guernsey Reservoir
<br />was transferred to the Inland Lakes early in October.
<br />
<br />~,;;;::'::,
<br />.::.-,.;:;".;.
<br />
<br />e:~i;i';:
<br />flt~~'
<br />!~;:"j,/:~"'~.
<br />",:, .,:....
<br />:::; ~...;~:':. ,~~::. I
<br />
<br />~~;~\::;;~ I
<br />
<br />
<br />~.:~~.:~
<br />.. ~:"'
<br />
<br />.."'1
<br />: ~ .
<br />
<br />18
<br />
<br />"', .
<br />
<br />... .".' -,' . ..~~ ~
<br />':~:.~.~:':.~ti:~~Y{;;;::'-Y:~~<,< ;':" .:.~;;~~~, :':;:~'?:::;.<:':~~:t:;':.:~:3i:,;:':,S~:5,;~;.~t1i?:[';~~!C~:};~~'i'::~~\~:<t:.:';);::"'(';, .,...:.:.. ~{5:~:tA:~,<:'...,.,~:.".':'
<br />
|