My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00313
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:42 PM
Creation date
10/11/2006 9:39:05 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8510.100.60
Description
Rio Grande Compact Commission
Basin
Rio Grande
Water Division
3
Date
1/1/1960
Title
Report of the Rio Grande Compact Commission 1960
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />~ <br />~ <br /> <br />1- <br /> <br />0; <br />0, <br />~ <br />~ <br />C <br />C <br /> <br />20 <br /> <br />RIO GRANDE COMPACT COMMISSION REPORT <br /> <br />The equipment, method and frequency of measurements at <br />each gaging station shall be sufficient to obtain records <br />at least equal in accuracy to those classified as "good" by <br />the U.S. Geological Survey. Water-stage recorders on the <br />reservoirs specifically named in Article II of the Compact <br />shall have sufficient range below Dlaximum reservoir level <br />to record major fluctuations in storage. Staff gages may <br />be used to determine fluctuations belOW the range of the <br />water-stage recorders on these and other large reservoirs, <br />and staff gages may be used upon approval of the Commission <br />in lieu of water-stage recorders on small reservoirs, <br />provided that the frequency of observation is sufficient in <br />each case to establish any material changes in water levels <br />in such reservoirs. <br /> <br />, <br /> <br />, <br /> <br />RESERVOIR CAPACITIES L1- <br /> <br />Colorado shall file with the Commission a table of <br />areas and capacities for each reservoir in the Rio Grande <br />Basin above Lobatos constructed after 1937; New Mexico <br />shall file with the Commission a table of areas and capac- <br />ities for each reservoir in the Rio Grande Basin between <br />Lobatos and San Marcial constructed after 1929; and Texas <br />shall file with the Commission tables of areas and capaci- <br />ties for Elephant Butte Reservoir and for all other reser- <br />voirs actually available for the storage of water between <br />Elephant Butte and the first diversion to lands under the <br />Rio Grande Project. <br /> <br />Whenever it shall appear that any table of areas and <br />capacities is in error by more than five per cent, the <br />COIlMission shall use its best efforts to have are-survey <br />made and a corrected table of areas and capacities to be <br />substituted as soon as practicable. To the end that the <br />Elephant Butte effective supply may be computed accurately, <br />the Commission shall use its best efforts to have the rate <br />of accumulation and the place of deposition of silt in <br />Elephant Butte Reservoir checked at least every three years. <br /> <br />ACTUAL SPILL~ <br /> <br />(a) Water releases from Elephant Butte in excess of <br />Project requirements, which is currently passed through <br />Caballo Reservoir, prior to the time of spill, shall be <br />deemed to have been Usable Water released in anticipation <br />of spill, or Credit Water if such release shall have been <br />authorized. <br /> <br />~ <br /> <br />. <br /> <br />1 Amended at Eleventh Annual Meeting, February 23, 1950. <br />2 Adopted at Fourth Annual Meeting, February 24, 1943. <br />
The URL can be used to link to this page
Your browser does not support the video tag.