My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00293
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00293
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:37 PM
Creation date
10/11/2006 9:37:39 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.700
Description
Platte River Basin - River Basin General Publications - Republican General Publications
State
CO
Basin
South Platte
Water Division
1
Date
4/29/1954
Author
BOR
Title
Bonny Dam - Technical Record of Design and Construction
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00220~, <br /> <br />LIST OF FIGURES (Continued) <br /> <br />Figure <br /> <br />Title <br /> <br />Page <br /> <br />29 RivE'r outlet valve house at edge of stilling basin <br /> <br />55 <br /> <br />30 Aerial view of spillway during construction <br /> <br />56 <br /> <br />), <br />, <br /> <br />31 General view of spillw~y stilling basin <br /> <br />56 <br /> <br />.' <br /> <br />32 General view of spillwClY crest <br />33 Flow diagram of sand processing plant 59 <br /> <br />57 <br /> <br />34 Plant used for processing sand 60 <br /> <br />35 Storage bin and conveyor used in unloading aggregate from railroad <br />cars ' 60 <br /> <br />36 Cement truck loading at silo 62 <br />37 Batching plant with cenlcnt elevator and storage bin 64 <br /> <br />38 Trammel screening arrangement 65 <br /> <br /> <br />39 Weighing scales and automatic recordograph 65 <br /> <br /> <br />40 Flow diagram for batching plant at Bonny Dam 67 <br /> <br /> <br />41 Typical terminal well for 40 piezometer tips 74 <br /> <br />42 Typical embankment settlemelit instalLation 75 <br /> <br />43 Typical foundation settlement installation 76 <br /> <br />44 Embankment piezometer installation at Bonny Dam 77 <br /> <br />45 plastic piezometer tubing being placed in trench 78 <br />46 View looking down terminal well 79 <br />47 Embankment settlement installations at Bonny Dam B1 <br />48 Surface settlement point installations at Bonny Dam 82 <br /> <br />49 Compacting backfill in special test pit 83 <br /> <br />50 Summary of field laboratory tests of compacted fin 87 <br /> <br />51 Test section for embanKment protection at Bonny Darn <br />52 Cement spotting for soil~cement test <br /> <br />68 <br />90 <br /> <br />1, <br /> <br />53 Pulverizing and mixing soil-cement <br /> <br />90 <br /> <br />54 Typical soil-cement section 92 <br /> <br />55 Motor patrot removing protective layer, exposing final 2 to 1 slope <br />of soU-cement 93 <br /> <br />56 Closeup view of asphalt as laid down by modified spreader box 93 <br /> <br />v <br />
The URL can be used to link to this page
Your browser does not support the video tag.