<br />19,e Js.nU1U7
<br />February
<br />Maroh
<br />April
<br />l1ay
<br />June
<br />Jul,.
<br />August
<br />September
<br />Ootober
<br />November
<br />Deoember
<br />
<br />TOTAL..193S
<br />GRAND TOTAL
<br />
<br />( 1)
<br />Coll111lbue
<br />GenerlLtiem
<br />12.700
<br />11,000
<br />21,300
<br />16,800
<br />20,000
<br />16,500
<br />13,800
<br />8,100
<br />12.400
<br />12,l.A
<br />12 :'00
<br />16,400
<br />
<br />174.100
<br />
<br />1.526.050
<br />
<br />(2)
<br />
<br />Base
<br />1,fl4J
<br />1.663
<br />1,841
<br />7.222
<br />9.231
<br />10.510
<br />12.499
<br />12.1<99
<br />12,01'''
<br />~.40
<br />1,782
<br />1.8la
<br />
<br />82,1~
<br />
<br />691.589
<br />
<br />BREAKDCMN OF GENERA.._JN OF THE THREE PROJECTS (Continued)
<br />IN THOUSAND KILOWATT HOURS
<br />
<br />(3) (4) (5) (6) (7)
<br />Sutherla11d Generation Tri..CoUll'by "Generation
<br />From Storage Total Baa. From Storage Total
<br />7,63' 9,474 3,940 1',880 17,82b
<br />8,100 9,763 4,504 14,733 19,237
<br />4,667 6,;08 '~70,8.489 12,192
<br />3,293 10,515 6~696 ;,989 12.685
<br />o 9,231 12_473 0 12,473
<br />o 10.510 17.548 0 17.548
<br />o 12,499 19,576 0 19,576
<br />516 13,015 17,9l!7 938 18.685
<br />o 12,088 15,93' 0 15.'31"
<br />2.326 11.466 11,902 4,232 16.134
<br />6,505 6.287 7.180 11,633 19,013
<br />4,377 6.218 9.421 7.961 17,382
<br />
<br />37 .417 119.574 130,823 68.061 198.884
<br />
<br />~,132 1.057,721 1.172,822 666.005 1.638.827
<br />
<br />'"....- .....: ".
<br />
<br />(e)
<br />Total
<br />Three Proj eot.
<br />40.dOO "
<br />40.000
<br />40.000
<br />40.000
<br />W.,704
<br />44.558
<br />~,1l75
<br />40.000
<br />40,421
<br />40.000
<br />40,000
<br />40,000
<br />
<br />492.558
<br />
<br />4.422,5'}8
<br />
|