Laserfiche WebLink
<br />, <br /> <br />- 4 - <br /> <br />COMMENTS ON ABOVE FIGURES <br /> <br />In the calculations on cost of alternate steam, it should be noted <br />that the cost is figured only on salable generation. - This seems to <br />be in error, since the cost of s team should be on total generation. <br />Since the U. S. Bureau of Reclamation report showed 209 million, kwh <br />generate:!., with 40,00C KW plant, 68,000 H;I.'I' would have a tot.al gener- <br />ation of 355,300,000 kwh, to produce J31,,00,000 kwh salatle. There- <br />fore, the cost of steam should read as follows: <br /> <br />capacity ~ 25.40 X 68000 <br />energy ~ $ .00317 X 355,300,000 <br />total <br />and the benefit to cost ratio as follows: <br /> <br />- 0 - <br /> <br />$1,727,200 <br />1,126,301 <br />$2,853,501 <br /> <br />2,853,501 = 1.455 <br />1,960,996 <br />