Laserfiche WebLink
<br />" <br /> <br />The active st:Jrage at both sites is of value only for seasonal re- <br />gulation since in most years the runoff during ~~y and June exceeds <br />the active reservoir capacity. Also consideration must be given in <br />analyzing any possible net contribution, to the evaporation losses <br />which in a lO-year period at each site would total nearly one-half <br />of the active capacity. liiithout a tie-in to irrigation through direct <br />use of facilities the small development at Curecanti would have to be <br />analyzed as a power project with the costs of development exceeding <br />the cost of a steam power alternate and a benefit-cost ratio of less <br />than unity. <br /> <br />- 4 - <br />