Laserfiche WebLink
<br />S~~RY OF ESTl}1ATED COSTS <br /> <br />2,5QO,000 <br />af res. <br /> <br />< , <br /> <br />Construction Costs <br />Land and lemd right s <br />Relocation <br />Dam-spillweLy-outlet works <br />Power plant: <br />Transmission <br />General prclperty <br />Totals <br /> <br />.fi.anual costs <br />--Dam - O&lVI <br />- Replclcement <br />jJower Plant: - O8JII <br />- Replacement <br />Transmission - O&M <br />- Replacement <br /> <br />Totals <br /> <br />940,000 <br />af res. <br /> <br />$815;000 <br />7,860,000 <br />61,465,000 <br />7,054,000 <br />7;668,000 <br />1.106.000 <br />$85,968,000 <br /> <br />$670 000 <br />, <br />6,280,000 <br />30,200,000 <br />5,735,000 <br />5,680,000 <br />':0" 000 <br />_._-~- <br />J49,:JOl,000 <br /> <br />19,000 <br />14,200 <br />112,900 <br />68,700 <br />62,700 <br />99.000 <br />,;);376,500 <br /> <br />11,200 <br />fi,800 <br />98,000 <br />45,800 <br />46,500 <br />73.300 <br />J279,600 <br /> <br />COST COMPliRISONS - (All costs allocated to power) <br /> <br />Initial constru.ction cost <br />Interest during construction <br />Total initial investiment <br /> <br />Initial investment amortized <br />With inter,~st at 2t1. <br />Annual O&M & replacement <br />Total annual cost <br />:"1~ lJ ratp. requirement for <br />repaymen.: <br /> <br />$85,968,000 <br />6.430.000 <br />$92,398,000 <br /> <br />$49,302,000 <br />3.700.000 <br />~53,002,000 <br /> <br />over a 50-year repayment period <br />3,258,000 1,868,900 <br />~ 376.500 .. _~79.600 <br />83,634,500 ~,148,500 <br /> <br />11. 8 mil~R /kwh <br /> <br />12. , 1 md j d -'kwh <br /> <br />BENEFIT":'GOST ANALYSIS <br /> <br />Benefits measured by annual cost of alternate <br />capacity - 54,000 kw at~25.40 = Jl,372,000 <br />energy - 308 million kwh at <br />$.00317 <br /> <br />Annual benefit s <br /> <br />steam -- <br />40,000 Kw = $1,016,000 <br /> <br />976,000 195 million <br />kwh <br /> <br />_ 618.000 <br />Jil,634,000 <br /> <br />$2,348,000 <br /> <br />r0:i: ::ost evaluation credit is takr-m for present value of reservoir <br />s~iV3.ge of dam and power facilitL~,; after 50 years estimated at <br />J~2, SOD. 000 for large and $7,150,0[10 fur small reservoir - resulting <br />h~nefit-cost ratios are: <br /> <br />2,500,000 af res. <br />940,000 af res. <br /> <br />,74 <br />.86 <br />= <br /> <br />- 2 - <br />