Laserfiche WebLink
<br />REVISED SUMMARY OF ESTI1JJ<TED CasTS OF 940.000 A.F. CURECANTI <br />")LIZING AVAILABLE P()lijER DROP TO'-'jiSTAL SITE <br /> <br />lSl}q 53 <br /> <br />Construction Costs <br />1. Land and land rights <br />2. Re1ocat.ion <br />3. Dam-spi.11way-outlet vrOl'l.;S <br />4. Pcr/ler plant - origin,,-l <br />u n tI increased <br />sub total <br /> <br />~5,735,000 <br />2,408,700 <br />SI:!,143 ,700 <br /> <br />$> 670,000 <br />6,280,000 <br />30,200,000 <br /> <br />$8,143,700 <br /> <br />5. (Transrr~ssion line (Curecanti-Gunnison, and Grand Junction) <br />(Substution <br />6. Gene:n 1. p~operty <br />7. Build nin~ miles of tunnel ~ $1,844,700 <br /> <br />total <br /> <br />1,000,000 <br />750,000 <br />737,000 <br />16,602,300 <br />$64,383,000 <br /> <br />Credit for C~Gts Allocated to Other Benefits <br />8. A. St,....,=". regulation <br />9. B. Ir:.~:::.,'~',ian <br />10. C. F).u,i control <br />11. D. Ir,d:' 3 ,~l'ial benefits <br />12. E. DOffi;3cic use <br />13. F. Rec:",ation <br />14. G. Salvd"e value, '" 14.5% <br /> <br />Total investment to be charged to power production <br /> <br />8,300,000 <br />no credit <br />350,000 <br />no credit <br />r,a credit <br />no credit <br />9,336,000 <br />$17,985,000 <br /> <br />$46,398,000 <br /> <br />Annual <br /> <br />15. <br /> <br />Costs <br />(Dam and tunnel <br />( <br />(Power plant <br />( <br />(Transmission <br />( <br /> <br />- ~,M <br />- Heplac<3ment <br />- OMI! <br />- ilepla~ement <br />- O&M <br />- Replacement <br /> <br />total <br /> <br />17,348 <br />10,533 <br />136,320 <br />65,036 <br />, 15,089 <br />23,785 <br />li 268,111 <br /> <br />COST COMPARISON <br /> <br />16. Initial construction costs allocated to pmver $46,398,000 <br />17. Interest during construction 3,482,000 <br />18. Total initial investment $49,880,000 <br /> <br />19. Initial investment amortized over 50 year period ~ 2-1/2% $1,551,460 <br />20. Annuli O:':M into 268,111 <br />21. Total annual :C3t $1,819,571 <br /> <br />22. Total amua). salable ga'lerJ.1.,ion 331,500,000 kwh <br />23. Mill rat'3 fOi' repayment 5.49 or 5.5 mills /~wh <br /> <br />casT OF ALTERNATE STEAM <br />Capac:cty charge, 68,000 ](Vi. "" $25.ho <br />Energ;r -;a;.ue $.G031?, - 331,500,000 <br /> <br />24. <br /> <br />1,727,200 <br />1,050,855 <br />$2,778,055 <br /> <br />25. BenefH to cost rat:i.o ~ 2.778,055 " 1.526 <br />1,619,571 <br />