Laserfiche WebLink
<br />.~~. <br />.; -~ <br /> <br />REVIEW OF F. M. PEI'ERSON ffiOFOSAL <br />940,000 a.f. Curecanti Reservoir <br />9-mi1e Pressure Tunnel and Power Plant <br />by <br />Region 4--Bureau of Reclamation <br />December 15, 1953 <br /> <br />PHYSICAL FEATURES <br /> <br />~ <br /> <br />Cure :anti Reservoir ca,pacity <br />Pres5Ure tunnel length <br />TUI1TIo31 diameter 11. <br />Tunnel capacity II <br />Head loss <br />Powe:rplant firm cafacity }j <br />Eneri?Y generation (sal- <br />able) y <br />Ener/?y generation (sal- <br />able) y <br /> <br />Peterson Study <br /> <br />Bureau Ad.iustment <br /> <br />940,000 a.f. <br />8.5 miles <br />14.3 feet <br />1,585 ds <br />10 feet/mile 8.8 feet/mile <br />68,000 kw 48,000 kw <br /> <br />331.5 million/kwh/yr. (1931-1947 average 332 <br />( M. kwh/yr <br />(min. year 26e <br />( M. kwh/yr. <br /> <br />940,000 a.f. <br />9 miles <br />12.5 feet <br /> <br />cosr EsrIMATES (Jan. 1953 Prices <br /> <br />Construction Costs <br />DaIl and Reservoir <br />Pouerplant and appurtenances <br />Prllssure tunnel <br />-r(''''-n~v.ls'S,Dn ~~C!:1'nn""n~:?i:in y <br /> <br />Total construction cost <br />Interest dur:ing construction <br /> <br />~,1 Costs (O&M & Replacement) ~ <br />DaD! and reservoir <br />Po;'erpJant and appurtenances <br />PrE'ssure tunnel (incl. in dam <br />and reservoir costs) <br />Transmission <br />Total annual O&M& replacement <br /> <br />$37,887,000 <br />8,:u,.3,700 <br />16,602,300 <br />1,750,000 <br />$64,383,000 <br />3,482,000 <br /> <br />$27,881 <br />201,356 <br /> <br />~.874 <br />12 ,ill <br /> <br />$37,887 ,000 <br />8,640,000 <br />23,400,000 <br />4,652,000 <br />$74,579,000 <br />4,670,000 <br /> <br />$18,000 <br />184,500 <br /> <br />16,000 <br />100,000 <br />$318,500 <br />