Laserfiche WebLink
<br />a <br />c' <br />.-' <br />0') <br />('.1 <br /> <br />,-.) <br />" <br /> <br />~ <br /> <br />':'1 <br />~j <br /> <br />F. REVIEW OF EMERGENCY PREPAREDNESS PLAN <br /> <br />The EPP should be reviewed for adequacy during the annual review of the <br /> <br />SOP; the certification review of the SOP shall denote the adequacy of <br /> <br />the EPP. <br /> <br />A periodic review should also involve local community and county leaders <br /> <br />to maintain coordination and understanding between Water and Power, water- <br /> <br />user entities, and local community leaders. <br /> <br />G. RECORD OF TELEPHONE REPORT OF EMERGENCY OR UNUSUAL CONDITIONS AND <br />FACILITY FAILURES <br /> <br />Records of all telephone or radio reports of emergency or unusual con- <br /> <br />ditions and facility failures shall be maintained at all steps of the <br /> <br />communication network. An original copy of this record (see sample copy <br /> <br />on following page) shall be maintained at each initiating and receiving <br /> <br />level in the Water and Power communications network. At the dam, the <br /> <br />record shall be maintained in the operating logbook. Records at all <br /> <br />levels are to be maintained in a manner to provide a continuing record <br /> <br />of emergency activities at a particular facility for future reference <br /> <br />and safety analysis of the structure. <br /> <br />H. INUNDATION MAPS <br /> <br />Inundation maps for the area below Platoro Dam have not been completed <br /> <br />at this time. When they are completed, they will be inserted as a part <br /> <br />of the appendix. <br /> <br />A-31 <br /> <br />.....- <br /> <br />~. <br />