Laserfiche WebLink
<br />~ high winds, tornadoes, etc. Data should include pertinent information <br />(:) <br />C"\l to aid in analyzing changes. The information will be coordinated <br />("J <br /> <br />..~-') <br />l..,) <br /> <br />between the Water and Power office and the Corps of Engineers. <br /> <br />11. FIRES <br /> <br />For forest or range fires in the dam and reservoir area: <br /> <br />a. Determine: <br /> <br />(1) Location and extent; <br /> <br />'" <br /> <br />(2) Possibility of fire spreading to Water and Power <br /> <br />property; <br /> <br />(3) Prevailing weather conditions; <br /> <br />(4) Loss of communications; <br /> <br />(5) possible long-term effects on watershed area; and <br /> <br />(6) Any other facts believed to be pertinent. <br /> <br />b. Contact the Chama Field Division and/or the URGBP office. <br /> <br />c. Contact the Colorado Forest Service office and the <br /> <br />Rio Grande National Forest, Fire Dispatcher. <br /> <br />For fires within or around the structure: <br /> <br />a. Determine location and severity; <br /> <br />b. Contact the Chama Field Division and URGBP office. <br /> <br />A-2l <br /> <br />- <br />