Laserfiche WebLink
<br />o <br />CO <br />W <br /> <br />, -; <br /> <br />c.) <br /> <br />.. ". <br />'-' <br /> <br />the Rio Grande below those reservoirs shall be equipped <br />maintained and operated by or on behalf of Texas through <br />the agency of the U. S. Bureau of Reclamation. <br /> <br />The equipment, method and frequency of measure- <br />ments at each gaging station shall be sufficient to obtain <br />records at least equal in accuracy to those classified as <br />"good" by the U. S. Geological Survey. Water stage re- <br />corders on the reservoirs specifically named in Article II <br />of the Compact shall have sufficient range below maxi- <br />mum reservoir level to record major fluctuations in stor- <br />age. Staff gages may be used to determine fluctuations <br />below the range of the water stage recorders on these and <br />other large reservoirs, and staff gages may be used upon <br />approval of the Commission in lieu of water stage record- <br />ers on small reservoirs, provided that the frequency of ob- <br />servations is sufficient in each case to establish any ma- <br />terial changes in water levels in such reservoirs. <br /> <br />Reservoir Capacities <br /> <br />Colorado shall file with the Commission a table of <br />areas and capacities for each reservoir in the Rio Grande <br />Basin above Lobatos constructed after 1937; New Mexico <br />shall file with the Commission a table of areas and capac- <br />ities for each reservoir in .the Rio Grande Basin between <br />Lobatos and San Marcial constructed after 1929; and <br />Texas shall file with the Commission tables of areas and <br />capacities for Elephant Butte Reservoir and for all other <br />reservoirs actually available for the .storage of water be- <br />tween Elephant Butte and the first diversion to lands un- <br />der the Rio Grande Project. <br /> <br />Whenever it shall appear that any table of areas and <br />capacities is in error by more than five percent, the Com- <br />mission shall use its best efforts to have a re-survey made <br />and a corrected table of areas and capacities to be substi- <br />tuted as soon as practicable. To the end that the records <br />of flow of the Rio Grande at San Marcial, at San Acacia, <br />and below Elephant Butte Reservoir may be correlated, <br />the Commission shall use its best efforts to have the rate <br />of accumulation and the place of deposition of silt in <br />Elephant Butte Reservoir checked at least every three <br />years. <br /> <br />Evaporation Lo&ses <br /> <br />The Commission shall encourage the equipping, <br />maintenance and operation, in cooperation with the United <br />States Weather Bureau or other appropriate agency, of <br />evaporation stations at Elephant Butte Reservoir and at or <br />near each major reservoir in the Rio Grande Basin within <br />Colorado constructed after 1937 and in New Mexico con- <br /> <br />;~ <br />