My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00225
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00225
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:19 PM
Creation date
10/11/2006 9:35:56 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
The Colorado Big Thompson Project - Reports
Basin
South Platte
Water Division
1
Date
12/1/1933
Author
RJ Tipton
Title
Preliminary Engineering Report - Northern Transmountain Diversion
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />o <br />,') <br />~...... <br />{I,}; <br />(,0 <br />OQ <br /> <br />TABLE OF CON1'ENTS <br /> <br />Pa.o:es <br /> <br />ACKNOWLEDGMENTS <br />F ORRWORD <br />I <br /> <br />1 <br />2~4 <br /> <br />INTRODUCTION <br /> <br />5-9 <br /> <br />SUMMARY AND CONCLUSIONS <br /> <br />10-22 <br /> <br />SOUTH PIATTE RIVER BASIN <br /> <br />23-56 <br />23-25 <br />26-27 <br />27 -32 <br />32-37 <br />37-38 <br />38-39 <br />41-56 <br /> <br />, General <br />Topographic Features <br />,Climatological Features <br />Irrigation Development <br />Crops <br />'Markets and Transportation <br />Water Requirements <br /> <br />THE PROPOSED GRAND LAKE <br />i OR <br />NORT.HE!lN TAANSMOUNTAIN PROJECT <br /> <br />57-153 <br />57-59 <br />59-64 <br />65-67 <br /> <br />General <br />Water Supply <br />Method of utilizing Water to be Diverted <br />. by the Proposed Project <br />Possible Conflict with Water Rights in <br />Colorado decreed frOlll the Colorado River <br />below the proposed diversion <br />RePlacement Storage <br />POssible Interstate Conflict <br />Design of Works <br />General <br />Hine No. 2 Reservoir <br />Tunne 1 <br />Distribution Cenals <br />Big ThOlllpson to Cache la Poudre <br />Big Thompson to Little Thompson <br />Hine #1 Reservoir <br />Power Plants <br />Estimate of Cost <br />S=y <br />. Northern Tunnel <br />Hine No. 2 Reservoir <br />Canal - Big Thompson to Poudre <br />H1ne No. 1 Reservoir <br />Stone Mountain Power Plant <br />Interest during Construotion <br />Mar~et for Water and Power <br />Liquidation of Cost of Project <br /> <br />68-83 <br />84-87 <br />88-90 <br />91-100 <br />91 <br />91-92 <br />92~94 <br />95-97 <br />95 -96 <br />96-97 <br />. 97-98 <br />98-100 <br />101-115 <br />101 <br />102 <br />103-104- <br />105 <br />106-111 <br />112-114 <br />115 <br />123-141 <br />. 142-153 <br />
The URL can be used to link to this page
Your browser does not support the video tag.