Laserfiche WebLink
<br />, ' <br /> <br />o <br />I\) <br />...... ',1.1 act-es of sh,-ut, and t,-ee p I ant j n3 <br />.:..~ 15 acres of gTass a.nd I e~3lJrne pi ant i ng <br />~rw~,1 12,514 feet of fenc i rig fot~ pt-otect i on and mana8ernerlt <br />17 shallow water- ponds for :3.:::: a.cres of IHater- <br />1 :edirnent basin <br />;2:,.2:30 feet of pipel ine fot- 1...latet- rjei ivet-y <br />,~,O acres (if wi Idl ife uplan1j hatlitat marla~3efflent <br />34 act-es of IN i I rj life wet I and hab i tat management <br /> <br />Cost shar-e dollars t" I) t- these wi Idl ife pt-actices equals appr-oHirnately ::::~;; of <br />'the tota I do I I a,-s. <br /> <br />B. EI i:3ible F't-actices and Cost-Shat-e Levels. 1/ <br /> <br />1. On-Farm Salt Load Reduction: (SRP-l) - 70% cost share <br />(See attacrlment #2 {ot- c.:'mponents and effect Ive I I fespan.) <br /> <br />__ Off-Farm Salt Load Reduction: <SRP-2) - 70% cost share <br />(See a~tachment #2 for components and effective lifespan.) <br /> <br />:3. F'et-manent WI Idl I-Fe Habitat: (SRF'-:3) - 70;'; c,:ost share <br />(See a ttac hrnent #2 {Ot- c ':'mponents and effec t i 'Ie I I fesparl. ) <br /> <br />~~{~ <br /> <br />4. Shallow Watet- At-eas For oJi Idl Ife:(SRP-4) - 70Y. cost share <br />(See attachment #2 for components and etfective lifespan.) <br /> <br />1/ See attached Cost-Share Docket for more specific 'information <br />(In C(lst-Shat~ i"9. <br /> <br />III. Implementation Activities <br /> <br />A.Technical Assistance <br /> <br />1. Planning is proceeding on the remainins 207 appl ications <br />acco~din:3 to ~he established priority system. Additional staff, both <br />conset-vat i on I st arid techn i c i arl disc I p lines, wi I I be needed to cc,rnp I ete the <br />plannin:3 In a timely manner. <br /> <br />B. Cost-Share Assistance <br /> <br />1. A total of $:3,2:37,000.00 of cost-share funds have been <br />t"eceived throu:3h FY-91 and approximately $1,852,874.00 has been al located <br />in 53 contracts, as Apri I 1991. <br /> <br />2. At the present time several projected contracts are <br />"oreseen needin:3 State Committee or DASCO approval. The projects and needs <br />. I I be identified in future PIP and construction updates. One plan has <br />0;]eceived DASCO approval and two are awaitin:3 approval. <br />'.,;.,,~ <br /> <br />3. Cost-Sharing is avai lable for wildlife habitat to <br />replace projected values forgone. An accelerated wi Idl ife habitat <br />appl ication program is needed to take advantage <br /> <br />.... <br />