My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00183
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:07 PM
Creation date
10/11/2006 9:34:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.600
Description
Colorado River Basin Salinity Control - Federal Agency Reports - USDA
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1991
Title
Colorado SCS Salinity Projects - Part 2 of 3 - Lower Gunnison Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~~ <br /> <br />o <br />f\:)' <br />en <br />w <br /> <br />f~R~) <br /> <br />RATING FACTORS <br /> <br />TYPE OF PROJECT: <br /> <br />Group projects wi I I have priority over individual <br />long as they are within the scope of the program. <br /> <br />projects <br /> <br />as <br /> <br />PRIORITY AREA: <br /> <br />WS009 ---------- 15 points <br />WS008 ---------- 12 points <br />WSOll ---------- 09 points <br />WS007 ---------- 06 points <br />WS012 ---------- 03 points <br /> <br />SCOPE OF WORK: <br /> <br />Salt reduction and wi Idl ife --------- 15 points <br />Salt reduction only ----------------- 10 points <br />Wi I d life e,n Iy ---------'-------------- 03 pco i rots <br /> <br />SCHEDULE OF APPLICATION: <br /> <br />Less than 5 years ------------------- 05 points <br />More than 5 years ------------------- 03 pcoints <br /> <br />EXTENT OF SALINITY CONTROL WORK DONE: <br /> <br />More than 50/. ----------------------- 05 points <br />Less than 50/. ----------------------- 03 points <br /> <br />COORDINATION WITH ANOTHER PROJECT: <br /> <br />Yes --------------------------------- 05 points <br />No ---------------------------------- 01 pcoint <br /> <br />SIGN-UP PERIOD: <br /> <br />(~{\~j <br />"." <br /> <br />All appl icatioros wi II be serviced acccording to rar,kirrg after applying <br />the above ,-ating system to each. High priority jobs wi II be planned <br />before proceeding to lower priority jobs. Appl icants unable to make <br />firm planning decisions wi I I be serviced when decisions can be made. <br />Appl ications from a previous Sign-up wi I I be given an additional five <br />(5) pcoints when a new sign-up is added to the priority I isting, The <br />additional (5) points wi I I be given cone time only. A secondary <br />priority system based on cost per tcon ($60/ton) of salt reduction wi II <br />be used when there are more salt plans than funds for ccontracting_ <br /> <br /> <br />ATTACHMENT #3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.