Laserfiche WebLink
<br />'" <br /> <br />+--------------------~. PROGRAM/PROJECT COST <br />I Date 09/18/91 ~, <br />W' ,~ Lis;id <br /> <br />LIST <br /> <br />*-------------------------+ <br /> <br />Page <br /> <br />1 <br /> <br />~i1 <br />I" , <br />+----------+----+-----------------------------------+------+--------+---+---- <br />I Practice I I I I Unit I C-S I Type <br />category Id practice/component Name units Cost (%) Cost <br />+----------+----+-----------------------------------+------+--------+---+----+ <br />000 1 OPERATION AND MAINTAINANCE No. $0.00 0 NC <br />328 1 CONSERVATION CROPPING SEQUENCE Ac. $0.00 0 NC <br />344 1 CROP RESIDUE USE Ac. $0.00 0 NC <br />378 1 POND-EARTHWORK. C.Y. $1.30 70 AM <br />378 1A WILDLIFE POTHOLE BLASTING PER HOLE NO. $50.00 70 AM <br />378 1B SHALLOW WATER FEEDER DITCHES FT. $1.50 70 AM <br />378 2A 6" PIPE SPILLWAY LIN.FT $6.45 70 AM <br />378 2B 8" PIPE SPILLWAY LIN.FT $8.60 70 AM <br />378 2C 10" PIPE SPILLWAY LIN.FT $10.70 70 AM <br />378 3 BOTTOM WATER OVERFLOW NO. 1,000.00 70 AM <br />382 1 FENCING Ft. $1.25 70 AM <br />392 1 FIELD WINDBREAK (3 ROW,WR.G.& W.F.) Ft. $2.45 70 AM <br />392 2 FIELD WINDBREAK (3 ROW, W R.G.) Ft. $0.20 70 AM <br />393 1 FILTER STRIP Ac. $50.00 70 AM <br />428 1A 12" DEEP CONCRETE DITCH Ft. $5.35 70 AM <br />428 1B 14" DEEP CONCRETE DITCH Ft. $5.65 70 AM <br />428 1C 16" DEEP CONCRETE DITCH Ft. $5.95 70 AM <br />428 1D 18" DEEP CONCRETE DITCH Ft. $6.25 70 AM <br />428 1E 20" DEEP CONCRETE DITCH Ft. $6.55 70 AM <br />428 1F 22" DEEP CONCRETE DITCH Ft. $6'.85 70 AM <br />~8,1G 24" DEEP CONCRETE DITCH Ft. $7.15 70 AM" <br />'1'1:, ;8 2 FIBER REINFORCING OF CONCRETE Ft. $0.25 70 AM <br />t~ii~28 3A DROP OVER l' NO. $85.00 70 AM <br />-'428 3B DROP l' OR LESS NO. $70.00 70 AM <br />428 4A TURNOUT - 6" GATE NO. $35.00 70 AM <br />428 4B TURNOUT - 8" GATE NO. $40.00 70 AM <br />428 4C TURNOUT - 10" GATE NO. $45.00 70 AM <br />428 4D TURNOUT - 12" GATE NO. $60.00 70 AM <br />428 SA TURNOUT & STARTER - 6" GATE NO. $40.00 70 AM <br />428 SB TURNOUT & STARTER - 8" GATE NO. $65.00 70 AM <br />428 SC TURNOUT & STARTER - 10" GATE NO. $100.00 70 AM <br />428 SD TURNOUT & STARTER - 12" GATE NO. $140.00 70 AM <br />428 6 ADVERSE CONDITIONS -PAD PREPARATION C.Y. $0.80 70 AM <br />430 1 TRENCHING/BACKFILL - ADVERSE CONDo Ft. $6.00 70 AM <br />430 2A 6" INLINE VALVE NO. $370.00 70 AM <br />430 2B 8" INLINE VALVE NO. $478.00 70 AM <br />430 2C 10" INLINE VALVE NO. $545.00 70 AM <br />430 3A 6" STEEL SHORT SPAN FT. $8.00 70 AM <br />430 3B 8" STEEL SHORT SPAN FT. $7.51 70 AM <br />430 3C 10" STEEL SHORT SPAN FT. $10.12 70 AM <br />430 4A 6" INLINE FLOW METER NO. $927.00 70 AM <br />430 4B 8" INLINE FLOW METER NO. 1,107.00 70 AM <br />430 4C 10" INLINE FLOWMETER NO. 1,448.00 70 AM <br />430 SA 6" HIGH PRESSURE HYDRANT(STUB VALVE NO. $237.00 70 AM <br />430 SB 8" HIGH PRESSURE HYDRANT(STUB VALVE NO. $408.00 70 AM <br />430-DD 1A 6" HP PIP W/HYD. INSTALLED - 200' Ft. $5.30 70 AM <br />430-DD 1B 6" HP PIP W/HYD. INSTALLED - 500' Ft. $4.35 70 AM <br />'30-DD 1C 6" HP PIP W/HYD. INSTALLED -1000' Ft. $4.05 70 AM <br />.. O-DD 2A, 8" HP PIP W/HYD. INSTALLED - 200' Ft. $5.05 70 AM <br />,";';)~O-DD 2B 8" HP PIP W/HYD. INSTALLED - 500' Ft. $4.40 70 AM <br />~: c ..-________+____+___________________________________+______+________+___+____+ <br />