Laserfiche WebLink
<br />. <br /> <br />r~A T I NG FACTORS <br /> <br />&'W'> <br />~j!~ <br /> <br />TYPE OF PROJECT: <br /> <br />0- <br />~' <br />'~ <br />"'l <br /> <br />Group projects wi I I have priority over individual projects <br />as long as they are within the scope of the program. <br /> <br />F'RIORITY AREA: <br /> <br />WS001 ---------- 15 P ':1 i nts <br />WS004 ---------- 12 po i nts <br />WSOO:3 ---------- O'iJ po i nts <br />WS002 ---------- Of':'" po i nts <br />~.S026 ---------- O:~: po i nts <br /> <br />SCOPE OF WOR~~: <br /> <br />Salt t-eductic.n and wi Idi ife --------- 15 points <br />Salt reduction only ----------------- 10 points <br />!AI i I d I i f'e orll y ----------------------- 03 pc. i nts <br /> <br />SCHEDULE OF APPLICATION: <br /> <br />~"'} , <br />&,,,.,, <br />~~~ <br /> <br />Less tHan 5 years ------------------- 05 points <br />More than 5 years ------------------- 03 points <br /> <br />EXTENT OF SALINITY CONTROL ,.ORK DONE: <br /> <br />More than 50% ----------------------- 05 points <br />Less than 50h ----------------------- 03 points <br /> <br />COORDINATION WITH ANOTHER PROJECT: <br /> <br />Yes --------------------------------- 05 points <br />No -------~~------------------------- 01 point <br /> <br />SIGNUP PERIOD: <br /> <br />All appl icatior.s wi II bEl serviced accc.rding to ranking <br />after applying the above rating system to each. High <br />priority jobs wi I I be planned before proceeding to lower <br />priority jobs. Appl icants unable to make firm planning <br />decisions wil I be serviced when decisions can be made. <br />Appl ications ft-om a previous sign-up wi II be given an <br />additional five (5) points when a new sign-up is added to <br />to the priority listing, the additional (5) points will be <br />given one time only. A secondary priority system based On <br />cost per ton of salt reduction ($60/ton) wi II be used when <br />there are more salt plans than funds avai lable for <br />contracting. <br /> <br />ATTACHMENT #3 <br />