My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00183
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:07 PM
Creation date
10/11/2006 9:34:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.600
Description
Colorado River Basin Salinity Control - Federal Agency Reports - USDA
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1991
Title
Colorado SCS Salinity Projects - Part 2 of 3 - Lower Gunnison Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />r~A T I NG FACTORS <br /> <br />&'W'> <br />~j!~ <br /> <br />TYPE OF PROJECT: <br /> <br />0- <br />~' <br />'~ <br />"'l <br /> <br />Group projects wi I I have priority over individual projects <br />as long as they are within the scope of the program. <br /> <br />F'RIORITY AREA: <br /> <br />WS001 ---------- 15 P ':1 i nts <br />WS004 ---------- 12 po i nts <br />WSOO:3 ---------- O'iJ po i nts <br />WS002 ---------- Of':'" po i nts <br />~.S026 ---------- O:~: po i nts <br /> <br />SCOPE OF WOR~~: <br /> <br />Salt t-eductic.n and wi Idi ife --------- 15 points <br />Salt reduction only ----------------- 10 points <br />!AI i I d I i f'e orll y ----------------------- 03 pc. i nts <br /> <br />SCHEDULE OF APPLICATION: <br /> <br />~"'} , <br />&,,,.,, <br />~~~ <br /> <br />Less tHan 5 years ------------------- 05 points <br />More than 5 years ------------------- 03 points <br /> <br />EXTENT OF SALINITY CONTROL ,.ORK DONE: <br /> <br />More than 50% ----------------------- 05 points <br />Less than 50h ----------------------- 03 points <br /> <br />COORDINATION WITH ANOTHER PROJECT: <br /> <br />Yes --------------------------------- 05 points <br />No -------~~------------------------- 01 point <br /> <br />SIGNUP PERIOD: <br /> <br />All appl icatior.s wi II bEl serviced accc.rding to ranking <br />after applying the above rating system to each. High <br />priority jobs wi I I be planned before proceeding to lower <br />priority jobs. Appl icants unable to make firm planning <br />decisions wil I be serviced when decisions can be made. <br />Appl ications ft-om a previous sign-up wi II be given an <br />additional five (5) points when a new sign-up is added to <br />to the priority listing, the additional (5) points will be <br />given one time only. A secondary priority system based On <br />cost per ton of salt reduction ($60/ton) wi II be used when <br />there are more salt plans than funds avai lable for <br />contracting. <br /> <br />ATTACHMENT #3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.