My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00183
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:07 PM
Creation date
10/11/2006 9:34:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.600
Description
Colorado River Basin Salinity Control - Federal Agency Reports - USDA
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1991
Title
Colorado SCS Salinity Projects - Part 2 of 3 - Lower Gunnison Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. . <br /> <br />D. Priority Areas and Prioritization <br /> <br />~ <br />~i'!J <br />"".-i' arid <br /> <br />1. The estab Ii shed p'- i 0'- i ty system seerns to be w.,rk i ng we II <br />no additional changes are foreseen at this time. <br /> <br />o 2. Ct-iteria f'H- ,-atin'3 p,-i'H-ity at'eas within the Lower <br />l'V Gunnison #1 Tongue C,-eek P,-"ject At-ea wi i I be: <br />..... <br />~ 1. Critet-ia fo,- ,-ating pt-iot-ity areas within the Lower <br />Gunnison #1 (Tongue Creek) Project Area is based on the <br />salt load measured from certain locations within th.ese <br />watersheds. Each watershed is given a point rating fac- <br />tor based on the salt loading measurements with the <br />highest receiving the most points. See attachement 3 <br />Ra.tirlg Factcq-s. <br /> <br />3. Rating fact';'t-s. '.See attachrnent #3) <br /> <br />a. Type of pt.o..iect~ gt-OUP or i nd ivi dual. <br /> <br />b. Priority area of work. <br /> <br />c. Scope of work to be done. <br /> <br />d. Schedule I)f' appl ication for l.,Jot-k tel be completed. <br /> <br />~i~~!l <br /> <br />e. Extent of needed Sal inity Control work, cornpleted <br />under the other prograrns. <br /> <br />f. Coodination with another project. <br /> <br />g. Signup period. <br /> <br />E. Monitoring and Evaluation IM&E) <br /> <br />Objective-s of the Monitoring and Eva.luation are: <br /> <br />1. To quantify through a data gathering and evaluation <br />acti~itythesalt load reduction attt-ibutable to irnproved irrigation water <br />rnanagernent. <br /> <br />Z. To provide farrners with irnproved technical assistance fo~ <br />achieving irrigation ~ater management. <br /> <br />3. To evaluate changes in wetland and wi Idl ife habitat <br />resulting frorn irnproved irrigation syoterns and irrigation water rnanagernent. <br />HEP systern rnodels are being developed to evaluate before and after values <br />of habitat for subject species. <br /> <br />4. To deterrnine i.:,cal econornic irnpacts of this sal inity <br /> <br />-,roject. <br /> <br />G~A <br />._~:..,' to <br /> <br />5. To deterrnine changes that should be rnade in <br />achieve sat inity control objectives. <br /> <br />the project <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.