Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />{)00216 <br /> <br />7SA.! <br />l- <br /> <br />~ <br /> <br /> <br />Chalk Creek - alternative 2 <br />New QP at sec 26 - 15S - 80W; Chalk Creek 100 pstream of private inholdings <br />upstrea pine Lake (Fehlings Reservoir) <br />Amount on Chalk Creek above . e: A CWCB instream flow of 18 cfs year round is <br />acceptable at the QP, In ion, USFS requests a high flow between May IS and July <br />IS of at least 70% ankfull and up to 120 % of bankfull to move sands in stream, The <br />Group want is definition (limits) on the high flow request and assurance that there <br />would some upstream exchange potential particularly during runoff for existing and <br />e development. This option has not been fully investigated, <br /> <br />o <br /> <br />I 79A North Fork South Arkansas <br />QP at sec 17 - SON - 7E; Angel of Shavano Campground below McCoy Creek <br />Amount: The existing CWCB base flow of 10 cfs year-round is acceptable and needed <br />for fish purposes, <br /> <br />179C <br /> <br />79D <br /> <br />~~ <br />~ <br /> <br />I 79E <br /> <br />179F <br />d-~ CJ-9~~?~ <br />y.. I ~<{ <br />~IJ ~Q'\;Q;) <br />o!J' \ <br />f (1/ <br />~l <br /> <br />There is ~e on the North Fork South Arkansas, <br /> <br />Cree Creek <br />New QP at sec 31 - SON - 7E; 100 yards above the Silver Creek Station Diversion <br />Amount: A CWCB flow recommendation of 1.0 cfs from Sept. I to Nov, 14,0.5 cfs <br />from Nov, IS to Apr, 30, and 2,5 cfs from May I to Aug, 30 is acceptable and needed for <br />fish purposes, <br /> <br />There is ~e on Cree Creek. <br /> <br />Fooses Creek <br />QP at sec 36 - SON - 6E; Approximately ,25 miles above Public Service Co, Reservoir or <br />Fooses Lake <br />Amount: A proposed CWcBJlow,recommendation for a base flow of 1.75 cfs from <br />October IS to April 30, and 5.5 cfs from May I to October 14 is acceptable and needed <br />for fish purposes, <br /> <br />There is 1'19 rage on F ooses Creek. <br /> <br />Middle Fork South Arkansas <br />QP at sec 28 - SON - 6E; just upstream of confluence with tributary from Boss Lake <br />Amount: The existing CWCB instream flow of 5,0 cfs year-round is acceptable and <br />needed for fish purposes, <br /> <br />There is no jjage on the Mbi~I~~~~ ~?ut,!t ti~;nla~'%'N"'~o t/ <br />P"'~~_tL.-,', us""', '~';f;;;+:" r' lAst:/:Ii;" :f?1"",j~.Jed /..j/[~.I~I <br />South Arkansas River~WC.D . ,co-S r-/~ ',',', ,<!\, ~i , \ <br />QP at sec 5 - 49N - 6E; at Monarch Park Campground road c)' ~ \ ' )P <br />Amount: A GWGi:l flowrecommendation fo~a base flow orQ:D c'~ot?'October 16 to '^ lo.'~ ~ <br />April 15, and 6,0 cfs from April 16 to(Qctobef~needed for fish sQ:\'~'f.;his' c>>>b ,n~rI\ [~ <br />recommendation is made on measurements at a point just above the small tributary .(.,0 /" ' 1\I!lv <br />coming in from Monarch Ski Area, The QP was left in its original location and not v-.j, I' \ I~ <br />moved upstream, The intent was to keep the reach length protected as long as possible ~ ~/ <br />and quantify without considering any inflow from the Monarch Ski Area tributary, This IJ,~'; . <br />, ~~ ' <br />~\e<" ~ ~v' \\0"'" . . ~ <br />,~~e, ;~" 00" '\ \ooJ>' 9 !iOcJ~ ~~,.,' <br />VIP.' (Q \\'>' r / ~ 4- . <br />"'V \\0' to 1\ ./" '~ <br />