<br />.
<br />
<br />e
<br />
<br />{)00216
<br />
<br />7SA.!
<br />l-
<br />
<br />~
<br />
<br />
<br />Chalk Creek - alternative 2
<br />New QP at sec 26 - 15S - 80W; Chalk Creek 100 pstream of private inholdings
<br />upstrea pine Lake (Fehlings Reservoir)
<br />Amount on Chalk Creek above . e: A CWCB instream flow of 18 cfs year round is
<br />acceptable at the QP, In ion, USFS requests a high flow between May IS and July
<br />IS of at least 70% ankfull and up to 120 % of bankfull to move sands in stream, The
<br />Group want is definition (limits) on the high flow request and assurance that there
<br />would some upstream exchange potential particularly during runoff for existing and
<br />e development. This option has not been fully investigated,
<br />
<br />o
<br />
<br />I 79A North Fork South Arkansas
<br />QP at sec 17 - SON - 7E; Angel of Shavano Campground below McCoy Creek
<br />Amount: The existing CWCB base flow of 10 cfs year-round is acceptable and needed
<br />for fish purposes,
<br />
<br />179C
<br />
<br />79D
<br />
<br />~~
<br />~
<br />
<br />I 79E
<br />
<br />179F
<br />d-~ CJ-9~~?~
<br />y.. I ~<{
<br />~IJ ~Q'\;Q;)
<br />o!J' \
<br />f (1/
<br />~l
<br />
<br />There is ~e on the North Fork South Arkansas,
<br />
<br />Cree Creek
<br />New QP at sec 31 - SON - 7E; 100 yards above the Silver Creek Station Diversion
<br />Amount: A CWCB flow recommendation of 1.0 cfs from Sept. I to Nov, 14,0.5 cfs
<br />from Nov, IS to Apr, 30, and 2,5 cfs from May I to Aug, 30 is acceptable and needed for
<br />fish purposes,
<br />
<br />There is ~e on Cree Creek.
<br />
<br />Fooses Creek
<br />QP at sec 36 - SON - 6E; Approximately ,25 miles above Public Service Co, Reservoir or
<br />Fooses Lake
<br />Amount: A proposed CWcBJlow,recommendation for a base flow of 1.75 cfs from
<br />October IS to April 30, and 5.5 cfs from May I to October 14 is acceptable and needed
<br />for fish purposes,
<br />
<br />There is 1'19 rage on F ooses Creek.
<br />
<br />Middle Fork South Arkansas
<br />QP at sec 28 - SON - 6E; just upstream of confluence with tributary from Boss Lake
<br />Amount: The existing CWCB instream flow of 5,0 cfs year-round is acceptable and
<br />needed for fish purposes,
<br />
<br />There is no jjage on the Mbi~I~~~~ ~?ut,!t ti~;nla~'%'N"'~o t/
<br />P"'~~_tL.-,', us""', '~';f;;;+:" r' lAst:/:Ii;" :f?1"",j~.Jed /..j/[~.I~I
<br />South Arkansas River~WC.D . ,co-S r-/~ ',',', ,<!\, ~i , \
<br />QP at sec 5 - 49N - 6E; at Monarch Park Campground road c)' ~ \ ' )P
<br />Amount: A GWGi:l flowrecommendation fo~a base flow orQ:D c'~ot?'October 16 to '^ lo.'~ ~
<br />April 15, and 6,0 cfs from April 16 to(Qctobef~needed for fish sQ:\'~'f.;his' c>>>b ,n~rI\ [~
<br />recommendation is made on measurements at a point just above the small tributary .(.,0 /" ' 1\I!lv
<br />coming in from Monarch Ski Area, The QP was left in its original location and not v-.j, I' \ I~
<br />moved upstream, The intent was to keep the reach length protected as long as possible ~ ~/
<br />and quantify without considering any inflow from the Monarch Ski Area tributary, This IJ,~'; .
<br />, ~~ '
<br />~\e<" ~ ~v' \\0"'" . . ~
<br />,~~e, ;~" 00" '\ \ooJ>' 9 !iOcJ~ ~~,.,'
<br />VIP.' (Q \\'>' r / ~ 4- .
<br />"'V \\0' to 1\ ./" '~
<br />
|