My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00175
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:05 PM
Creation date
10/11/2006 9:34:04 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8062.200
Description
Federal Reserved Water Rights - USFS - Water Division 2 - Negotiating Principles and Settlement
State
CO
Basin
Arkansas
Water Division
2
Date
10/23/1997
Author
D Randolph Seaholm
Title
Technical Workgroup - Group 1 Stream Summary - October 23 1997
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />I <br /> <br />e <br /> <br />000223 <br /> <br />moving the QP upstream to avoid conflicts on Chalk Creek, <br />South Arkansas River. Heavy sediment load caused by Highway 50 <br />erosion, <br />Heavy sediment load caused by past dam failure, <br />Heavy recreational use by the public and sediment load <br />from road erosion. <br /> <br />Huerfano River, <br />Cucharas Creek, <br /> <br />In the meetings during the fall and winter of 1996 the technical group addressed and <br />attempted to resolve all conflicts that might exist between the concerns and goals of the Forest <br />Service and the objectors. On seven streams, Quantification Points (QPs) were moved upstream <br />to eliminate conflicts between the Forest Service and other water users, On all other streams, the <br />QPs were already located at sites that allowed for reasonable future water development. Based <br />on those discussions, and the adjustments to the QPs, the technical group concluded that present <br />and future water use needs can be met on all streams, including those on which high flows are <br />being sought. <br /> <br />The following are the base flow and high flow rates sought for the Group I streams on <br />the national forest: <br /> <br />17G Camp Creek: USFS claim dropped <br /> <br />19A South Catamount Creek: Base flow of2,O cfs from Oct 16 to April 15, and 2.6 cfs from <br />April 16 to Oct IS, is needed for fish survival. High flow of7,O cfs to 12,0 cfs is needed <br />for 20 days between May I and July 15 to maintain functions and habitats of greenback <br />cutthroat trout. <br /> <br />19E <br /> <br />South Fork French Creek: Base flow of 1.0 cfs from Oct 16 to April 15, and 2,0 cfs from <br />April 16 to Oct 15, is needed for fish survival. Highflow of 13 cfs to 22 cfs is needed for <br />20 days between May I and July IS to maintain functions and habitats of greenback <br />cutthroat trout. <br /> <br />191 <br /> <br />Little Fountain Creek: Base flow of 4.0 cfs from Oct 16 to April IS, and 13,0 cfs from <br />April 16 to Oct 15, is needed for fish survival. High flow of 55 cfs to 94 cfs is needed for <br />20 days between May I and July IS to maintain functions and habitats of greenback <br />cutthroat trout. <br /> <br />21C <br /> <br />West Fork West Beaver Creek: USFS claim dropped. <br /> <br />59D <br /> <br />West Tennessee Creek: Existing CWCB base flow of 4,0 cfs year-round is needed for <br />fish survival. <br /> <br />59E <br /> <br />Longs Gulch: Existing CWCB base flow of2,O cfs year-round is needed for fish survival, <br /> <br />- 3 - <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.