Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />e <br /> <br />. . <br /> <br />..000220 <br /> <br />,i 93J <br /> <br />Qu~ <br />111 <br /> <br />.1 93K <br /> <br />~ <br />t~~ <br /> <br />There is no lZalZe on Baker Creek. <br /> <br />South Fork Baker Creek - Md~S Dk +(;(./hto .;;~i ~ <br />QP at sec 16 - 318 - 69W; 100 yards upstream from the forest boundary in <br />approximately the center of the section <br />Amount: A <::;WGli!, flo", recommendation for a base flow of 0,75 cfs from October 16 to <br />April 15, and 2,0 cfs from April16 to October 15, is acceptable and needed for fish <br />purposes. <br /> <br />,<l' <br /> <br />There is no gale on the South Fork Baker Creek, <br /> <br />Cucharas Creek ~.....~I..~ wIS. <br />QP at sec 22 - 31S - 69W; at the forest road move <br />Amount: A CWCB flow recommendation for a base flow of 2,Ocfs from October 16 to <br />,,~. ',- ,\ -' . <br />April 15, and 4,75 cfs from Apri116 to October 15, is needed for fish purposes,ln <br />addition, USFS requests a __between May 1 and July 15 of at least 70% of <br />bankfull and up to 120 % of bankfull (quantified as 84 cfs to 144 cfs) to transport heavy <br />sediment loads caused by natural and road erosion, maintain channel capacity, geometry <br />and aquatic habitat in this alluvial stream, The Group is comfortable with this request, <br />as there are no private 1andsupsti'eam of the QP, " <br /> <br />No (,,r" J. 'fA r!c ~ ' t /0 <br />o '(~ WI " U9 '; ,'c;~<<!;'ce\winWOrd\d2fsrwr,sum <br /> <br />fo uJ4..SJ~ec:l-/~ J/~ ~ <br />~~ <br /> <br />13 <br /> <br />IKf <br /> <br />,I <br /> <br />i <br /> <br /> <br /> <br />'" <br />.a' ~" <br /> <br />". <br />