My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00173
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00173
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:05 PM
Creation date
10/11/2006 9:33:58 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.A
Description
UCRBRIP Habitat Restoration
Basin
Colorado Mainstem
Date
10/8/1997
Author
UCRBRIP
Title
Final Habitat Restoration Program FY 1998 Work Plan Part 2
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />n and ScheHlIle: <br /> <br />Tasks? <br /> <br />I. Continue to develop and evaluate strategies for effective, standardized sampling of <br />adult razorback sucker in the middle Green River and monitor relative abundance. <br /> <br />2. Begin to develol? and evaluate strategies for effective, standardized sampling of <br />adult razorback III the lower Green River. . <br /> <br />3. Continue to monitor relative abundance of larval razorback sucker in the middle <br />Green River. <br /> <br />4. Continue to monitor relative abundance of larval razorback sucker in the lower <br />Green River. <br /> <br />5. Process samples, analyze data, integrate results/reports of all sampling efforts, <br />prepare overall annual report, and revise the monitoring plan. <br /> <br />Schedule ? <br /> <br /> Tasks A M J <br /> 1 X X X <br /> 2 X X X <br /> 3 X X <br /> 4 X X <br /> 5 X X <br />VIII. FY-98 Work: <br /> DeliverableslDue Dates? <br /> <br />1998 <br />J A <br /> <br />S <br /> <br />o <br /> <br />N <br /> <br />D <br /> <br />X? <br />X? <br />X X <br /> <br />X <br /> <br />X <br /> <br />X <br /> <br />X <br /> <br />Report on 1998 results (integrated with 1996 and 1997 results), and revised monitoring <br />plan based on results of this and other related studies; January 1999. <br /> <br />Budget ($) ? <br /> <br />Task I, adult monitoring middle Green River <br /> <br /> Vernal UDWR UDWR <br /> CRFP Vernal Moab LFL <br />Labor 39.50K 29.00K <br />Travel <br />Equipment 2.00K 2.00K <br />Other <br />Total 41.50K 31.00K <br /> <br />Page 14 of _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.