My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00156
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:01 PM
Creation date
10/11/2006 9:33:08 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.700
Description
Fryingpan-Arkansas Project - Annual Operating Plans and Reports
State
CO
Basin
Arkansas
Water Division
5
Date
11/1/1983
Author
US DoI BoR
Title
Annual Operating Plan Fryingpan-Arkansas Project Colorado 1983 - 1984
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />151'1 <br /> <br />through July Ruedi Reservoir inflow as well as projected project imports for <br />Turquoise Lake will be started on February and continue on the first of . <br />each succeeding month through May 1. <br /> <br />The contract with the District requires notification be given to the <br />District by April 15 of the quantity of water available for their use <br />through April 3D, 1985, <br /> <br />B. Ruedi Reservoir <br /> <br />Rued i Reservoi r will be operate~ in water year 1984 to control <br />spring runoff, provide maximum storage for use by recreational interests, <br />enhance fish and wildlife and make, on demand, releases of contracted water. <br />This is an interim plan until a long term market is developed for all the <br />available stored water. Short term sales may be made on a year-to-year <br />basis as the need develops for water. <br /> <br />1 . I nfl ow <br /> <br />Under most probable conditiqns, the inflow will be 109,400 <br /> <br />acre-feet. <br /> <br />2. Minimum Release <br /> <br />The mlnlmUm release requirements, as described in the <br />operating principles, are 39 ft3/s from November I through April 30 and 110 <br />ft3/s from May 1 through October 31 or native inflow, whichever is less. <br />These flows include water from Rocky Fork, <br /> <br />. <br /> <br />3. Reservoir Operations <br /> <br />The planned releases from Ruedi Reservoir for October through <br />December would be approximately 150 ft3/s, Releases from January through <br />April would be set at a flow which would draw the reservoir down to an ele- <br />vation of 7706.0 feet, However, based upon the type of runoff season indi- <br />cated by monthly snowpack data, the outflow from the reservoir and the <br />target elevation may be adjusted. Monthly estimates of probable inflow <br />would be made following the February 1 thrqugh May 1 runoff forecasts. <br /> <br />Recreation interests requested that the reservoir water level <br />not be drawn down below elevation 7706.0 feet (53,100 acre-feet), which is <br />2.0 feet above the bottom of the Forest Service boat ramp. This request <br />will be honored until additional long term contracts are developed for the <br />sale of the remaining storage water. <br /> <br />The operating plan indicates that the rese~voir will be filled by about July <br />5, thus providing recreational benefits du~ing the summer months, as well as <br />sports fishlng on the Fryingpan River below Ruedi Dam during the first part <br /> <br />20 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.