Laserfiche WebLink
<br />r-' <br />c...'" <br />o <br />0.') <br /> <br />Twin Lakes/Mt. Elbert Forebay <br />Water Year 1983 Operations <br />Unit: 1,000 Acre-Feet <br /> <br /> Inflow End of Monthll Water SurfaceY <br /> Twin Lakes Halfmoon Project Native Total Total <br /> Year Month Imports Inflow Imports Inflow I nfl ow Evap Outflow Content Elevation <br /> 1982 Sep 111.3 9184.86 <br /> Oct 0.8 0 3.4 3.8 8.0 0.2 9.2 109.9 9183.65 <br /> Nov 1.6 0 9.1 1.2 11.9 0.1 13.1 108,6 9183.36 <br /> Dec 1.7 0 19.2 0 20.9 0 21.3 108.2 9182.59 <br /> 1983 Jan 0.9 0 19.0 0 19.9 0 21.2 106.9 9182.51 <br /> Feb 0.7 0 17 .3 0 18.0 0 17.5 107.4 9181. 68 <br />>--' Mar 0.4 0 1.2 0.1 1.7 0 11.0 98.1 9179.91 <br />.. <br /> IIpr _ 0.1 0 1.2 1.4 2.7 0 3.2 97.6 9178.94 <br /> May 5.1 - a-- 1.3 -2--:-2 8.6 0-.-2 5.3 100.7 9179.78 <br /> Jun 26.8 0 2.33/ 35.4 64.5 1.0 41.5 122.7 9189.32 <br /> Jul 15.6 0 9.D'" 23.6 48.2 1.1 62.3 107.5 9181. 64 <br /> Aug 3.5 0 0.1 17.4 21.0 0.7 10.3 117.5 9186.99 <br /> Sep 1.2 0 1.1 5.6 7.9 0.9 8.1 116.4 9188.43 <br /> Total 58.4 0 84.2 90.7 233.3 4.2 224.0 <br /> 1I Contents of both Twin Lakes and Mt. Elbert Forebay. ~ <br /> Y Elevation of Twin Lakes. t;:; <br /> '" <br /> 1I Includes 3120 acre-feet imported hy the Project through 'Ikin lBkes Tunnel. <br /> <br />. <br /> <br />. <br /> <br />. <br />