My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00156
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:01 PM
Creation date
10/11/2006 9:33:08 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.700
Description
Fryingpan-Arkansas Project - Annual Operating Plans and Reports
State
CO
Basin
Arkansas
Water Division
5
Date
11/1/1983
Author
US DoI BoR
Title
Annual Operating Plan Fryingpan-Arkansas Project Colorado 1983 - 1984
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />_A ....., ~ <br />_JJl <br /> <br />. <br /> <br />During water year 1983, the flow at Thomasville was less than the set rates <br />on two occasions. The first time was from May 14 through May 22 when <br />Ivanhoe diversion was the only site diverting. It was shut down as soon ,as <br />possible. The second occurrence was at the end of August when the flow- <br />dropped for two days. When this situation occurs, the diverions into <br />the project sytem are decreased or stopped, whichever is necessary to <br />meet the bypass requirements. Only the Hunter Creek system, which <br />drains into the Roaring Fork River, continues diverting water into <br />Charles H. Boustead Tunnel. <br /> <br />. <br /> <br />Exhibit 3 shows the flows at the Thomasville River gaging station and the <br />minimum flow requirements. <br /> <br />Project Diversions <br /> <br />The water year 1983 outlook used a project diversion of 60,000 acre-feet for <br />the most probable runoff condition. The February 1, March 1, April 1 and <br />May 1 forecasts, based on Soil Conservation Service snow course data, pro- <br />jected' diversions of 57,040 acre-feet, 42,400 acre-feet, 68,900 acre-feet, <br />and 83,300 acre-feet, respectively. <br /> <br />The actual diversion was 87,670 acre-feet as measured at the outlet portal <br />of the Charles H. Boustead Tunnel and 3,120 acre-feet conveyed through the Twin <br />Lakes Tunnel for a total import of 90,790 acre-feet. The maximum mean daily <br />import through the Charles H. Boustead Tunnel was 950 ft3/s on June 24, <br />1983, with a maximum instantaneous peak of 963 ft3/s. A senior call was not <br />made on the Colorado River; therefore, no releases from Ruedi Reservoir were <br />necessary to replace project diversions. <br /> <br />The yearly total imports, the water used for Twin Lakes Canal Company <br />exchange, and the accumul ated imports to the Arkansas River are shown on <br />table 3. The 12 years of accumulated imports total 534,600 acre-feet for an <br />average of 44,550 acre-feet per year. <br /> <br />The discharge records for all diversions in water year 1983 are shown in <br />appendix A. <br /> <br />Measuring Devices <br /> <br />During water year 1983, no additional river gagin9 stations were verified by <br />the Colorado Division of Water Resources Division 5 Engineer, as having an <br />acceptable rating.table for the measuring device. <br /> <br />Twin lakes Exchange <br /> <br />On September 13, the Twin Lakes Reservoir and Canal Company began delivering <br />water into the Roaring Fork River drainage in exchange for water in Twin <br />Lakes. The exchange followed the operating criteria as shown in appendix B. <br />The runoff season was determined to be a normal runoff year and settings <br /> <br />7 <br /> <br />. <br /> <br />... <br />
The URL can be used to link to this page
Your browser does not support the video tag.