Laserfiche WebLink
<br />{2~ .1 <br />C} .J .., <br /> <br />Par 13 <br /> <br />D4drag ttl~ contract period, th~ contractor shall <br />make "all necessary preparation, and shall maintain <br />reQ~ir~d tl~W$ in the West Pueblo, Bessemer, and <br />H'r!'p.B.1I ditch.s. All div.rsion operations shall b. <br />subj.ct tq the provisions of Paragraphs 61, 14, and <br />7(\. <br /> <br />c. Closure of divenion conduitS.-ln the initial <br />construct;\on for PUilblo Dam a concrete plug was <br />construGtl!ld in the river channel. Incorporated into <br />this plug are two diversion conduits and a bypass, as <br />shaw" on the drawings The contractor shall utilize <br />theta conduits and bypas!. as part of his diversion <br />works. <br /> <br />Concr.t. placem.nt for Buttr... 16 .hall b. d.l.yed <br />until att.r the IIQOd ....on of 1913 to allow the top <br />01 the existing plug to be u..d lor paning flood <br />flow.. On October 16, 1973, closur. of tha <br />d;version conduits .h.1I b. .ccomplished by <br />installing. ~h, ~9vernm8nt-furnished stop1ogs over <br />the 8ntr~o.c,s 19 the conduits, storage of water in <br />the re~~fvoir w.u.lGe'gin, and minimum downstream <br />w.t.r r~.\\\ll~~!lt1. ,hall b. pa"ed through the 4. <br />by 4-fo.\1.1 ~"9!IS. The bypass gate shall be ope.rated <br />bV the cQptractor as directed to furnish minimum <br />downstream water requirements. When the reservoir <br />water surface rtachs.s ~n. elevation sufficient to pass <br />downstream watlr reQ4irements through the river <br />outlet, the byplss ~\~ .h.II be closed Th.realter, <br />a"d until the Ind of the contract, the contractor <br />shall operate the river outlet works and any of the <br />spil!way outlet works as may be neCBlSsrv to <br />provid~ for such Ilows as will be dir.cted. It is <br />{l;ntiC;:tP.~ted that the reservoir will be at elevation <br />419lp by May 1, 1914 <br /> <br />From d.ate of award of contract and until the <br />installatio,1j1 of stopJogs to close off the diversion <br />cooduits l!.o.1', bYPI.. i. complet.d, the contractor <br />shall remov~ all f1oltabl. d.bris Irom th.t area. <br />upstream 9.t the concrete plug and below elevation <br />4750. Th.t...lter, and until the .nd of the contr.ct <br />pet iod. the contractor ,hili perform s.uch <br />maintBt1anCe af.ld erect such log booms and other <br />structU~B~ as may be necessary to maintain that Brea <br />upstream 01 the spillway and outlet works Ir... and <br />c1eer 01 all floatable debris. The cost of removal 01 <br />all floatabl. debri. .od the COlt of meintainiog the <br />ar.a free of floata.bl. d.bri. shill b.. includ.d in the <br />applicable pr:ices bid in the schedule for clearing and <br />for dive~sion and, care of river during construction <br />and removal ot. water from foundations. <br /> <br />d Payment.-Payment for care of the river during <br /> <br />SPECIFICATIONS NO. DC,6945 <br />(SUPPLEMENTAL NOTICE NO.3) <br /> <br />construction and removal of water from <br />found.tions will be made at the lump,sum price bid <br />thlrlfor in the sch.dula. Except as oth.rwise <br />provided io Paragraph 81, the lump-sum price bid in <br />the schedule for care of river during construction <br />and r.mov.1 of wat.r Irom foundations shall includ. <br />the co.t of furnishing all labor, equipment, and <br />materials for constructing cofferdams, log booms, <br />dike., channels, flum.s, and oth.r t.mporary <br />diversion and protective works; removing or leveling <br />such works and disposing of m.terials, where <br />required; making required closures; maintaining the <br />work free from water as required; grouting drains <br />aod .umps; cl.aning chut.s and stilling basins after <br />diversion; and all oth.r work r.quir.d by this <br />paragraph, <br /> <br />The contr.ctor'. water control pl.n for care of the <br />river Ind removal of w.ter from foundations shall <br />be "n ouch form "' to alloclte the total lump-sum <br />pri... to not more than .ix major dlvl.ions of the <br />work to be performed under the item of the <br />schedule for care of the river during construction <br />aod removol of wit.r from foundation.. Each major <br />divi.ion of work .hall be outlio.d ind .hall- be <br />identified by titl. and the wat.r control plan shall <br />.how the proportionate plrt of the total lump-.um <br />price allocat.d to .ach such major division 01 work. <br />Th. lbov. III0catioo of the lump-.um price .hall be <br />subj.ct to the approval of the contrlcting officer, <br />eod wh.n Ipprov.d'- .h.II become a part of the <br />contract. In prep.ring monthly estimates for <br />progr... payments consideration will be giv.n to the <br />paraentag. of .ach m.jor division of work <br />parform.d during the month for which such <br />..timlte i. prepered. <br /> <br />74. MAINTENANCE OF FLOW IN <br />BESSEMER DITCH DURING <br />CONSTRUCTION <br /> <br />., G.neral,- The Bauem.r Oitch conv.y. wlter <br />through the con.tructlon .it. II .hown on Drawing <br />No, 4:1 1312.0.13&2), Th. contr.ctor .h.1I be <br />respon.lble for m.lntlining the B....m.r Ditch .nd <br />the flow th.rain II follows: <br /> <br />(1) In the r.ach of ditch ext.nding from the <br />t B"9Il' Croak Siphon locat.d in SE 1/4 sec 35, T t <br />20 S, R 811 W to the dam until after October 16, <br />11113, whan ri.ing r.servoir waters will prevent <br />t such work. Th. contractor shall conduct his <br />oparation. in the vicinity of the B....m.r Ditch <br />upstraam from Bogg. Creek Siphon '0 as not to <br />interfere with the operation and m.inten.nce of <br />the ditch by the ditch company. t <br /> <br />(21 In the reach 01 the ditch ext.nding from the <br />dam to the upstream sid. 01 the n.w State <br /> <br />44 <br /> <br />'.. <br /> <br />. <br /> <br />~ . <br /> <br />. <br /> <br />. <br /> <br />/- <br /> <br />, <br />