Laserfiche WebLink
<br />i ' .' · <br />'...:;) L <br /> <br />10. I n Subparagraph 74d., page 46, eighth line of <br />the n subparagraPh, ---cna"nge-" ';BessE!mer Ditch <br />headworks" to "80ggs Creek Siphon". <br /> <br />11. In Par~graph 95, page 64, seventh line from the <br />end of theparagra"pt"C iii~erf a "comma" between <br />"plant" a~d ~'m~(~rrals". ' . <br /> <br />12. In Subparagrap,h 10sa., Page 7~, fifth Ii~e of <br />the subpar~taph. after the ~Qrd "wp{ks," insert <br />"in the vicinity of Buttress 17 for any parking area <br />development around Buttresses 6 and 7". <br /> <br />13. In Paragraph 116, page 82, left column, tenth <br />line from the top of the page, change "180 feet" to <br />"210 f.et". <br /> <br />14. In Subparagraph 129c., page 93, left column, <br />last line on the pigs, delete the word "mass"; and in <br />the right column, in the sixth and seventh lines from <br />the end of the subparagraph, delete "by the <br />Government". <br /> <br />15. In Subparagraph 1290., page 94, fourth line <br />from the end of the paragraph, after the word <br />"contract." add "The qualificatio~s of these <br />employ..s shall be submitted to the authorized <br />representative of the contracting officer for review <br />and approval prior to employment." <br /> <br />16. In SUbparagraph 143c., page 109, sixth line <br />from the bottom of the page, after the word <br />"prints" insert "and a reproducible". <br /> <br />17. In Subparagraph 145b., page 111, in the <br />twenty-sixth, twenty-seventh, and twenty-eighth <br />lines from the top of the page, delete "at locations <br />N 32,324.92, E 14,652.93, and N 584,000.3, E <br />2,222,588.9," and substitute therefor "DH.l (X = <br />3,223,141, Y = 1,584,573), and DH-416 (X = <br />3,223,159, Y = 1,584,1501". <br /> <br />18. In Paragraph 148, page 119, right column, <br />twelfth line from the top of the page, delete the <br />word "mass" and change "damaged" to "dam and". <br /> <br />19. In Paragraph 151, page 122, fourth line of the <br />paragraph, before the word "Measurement" insert <br />"Measurement, for payment, of buttress concrete <br />placed below the top of the buttress fillets will be <br />made on a batch count basis." <br /> <br />20. In Subparagraph 154b., page 123, right column, <br />at the end of the subparagraph, add the following: <br /> <br />. --..--... ~ .... .-.,- <br /> <br />,-. <br /> <br />"The eight 6- and 3-inch.diam~ter core holes in the <br />top s.urface .of the concrete plug shall be filled with <br />concrete and shall be paid for as concrete in dam." <br /> <br />.---- <br /> <br />21. I n Subparagraph 176a., page 137, right column, <br />fourth line from the bottom of the page, after <br />"substation." add the following sentence: ''The <br />contractor shall also furnish and install a ground rod <br />at the terminal pole to ground the shield of the <br />direct-burial cable." <br /> <br />22. In Subparagraph 180c., page 146, left column, <br />six teenth I ine from the top of the page, change <br />"outside" to "from". <br /> <br />23. In Subparagraph 182c.(2I, page 152, first line, <br />after "Terminal blocks,-" insert "Terminal blocks <br />shall be in accordance with the requirements of <br />Subparagraph 186b.(3)(a)." <br /> <br />24. In Paragraph 186, page 156, right column, <br />delete the !ast six lifles of Su~paragraph a" and <br />insert this same information in Subparagraph b.{ 1) <br />on page 157, after "Panelboards.-", <br /> <br />25. In Subparagraph 186c., page 159, second and <br />third lines of the subparagraph, change "three <br />pane/boards" to "six panelboards" and delete the <br />words "for the 24. and 48.jnch butterfly valves and <br />for the 72-inch slide gate controls", <br /> <br />. <br /> <br />26. In Subparagraph 188a., page 161, left column, <br />~cQnd Ene Qt the subpara9faph, beiore the words <br />"butterfly valves" insert "motor-operated", <br /> <br />27. In Subparagraph 194d., page 172, at the end of <br />the subparagraph, add "In addition the contractor <br />shall forward a copy of his transmittal letter to the <br />Construction Engineer, Post Office Box 551, Salida, <br />Colorado 81201." <br /> <br />28. In Subparagraph 198c., page 179, left column, <br />in the sixth and seventh lines of the subparagraph, <br />delete "4.way solenoid valves,". <br /> <br />29. In Subparagraph 198c.l41, page 180, second <br />line of the subparagraph, change "220.volt" to <br />"460-volt"; in the eighteenth line change "between <br />115 and 120" to "at no more than 115"; and in the <br />nineteenth line, delete the word "running". <br /> <br />30. In Subparagraph 248Ac., page 244, in the first <br />and fifth lines of the subparagraph, change <br />"concrete" to "shot crete", <br /> <br />. <br /> <br />2 <br />