Laserfiche WebLink
<br />River water be available from the <br />reservoir to meet these require- <br />ments, additional water will come <br />from Ridges Basin Reservoir <br />(through Ridges Basin Pumping <br />Plant, Dry Side Canal and the <br />La Plata River). <br /> <br />Sprinkler irrigation will be <br />used on all project lands, The <br />lateral systems will provide <br />sprinkler pressure at each farm <br />turnout. Pumping plants will <br />provide this pressure where the <br />ground slope is insufficient to <br />pressurize the pipeline. Project <br />drainage will also be furnished, <br />where required, on project land. <br /> <br />Fisheries will be created in <br />the inactive pools of Ridges Basin <br />and Southern Ute Reservoirs. In <br />addition, recreational facilities <br />will be provided at these reservoirs. <br /> <br />Schedule <br /> <br />The Definite Plan Report and <br />the Draft Environmental Statement <br />are scheduled for completion by <br />December 1977. <br />