<br />Table 1 - Estimated Installation Cost <br />Highline Breaks Watershed, Colorado <br /> <br />o <br />o <br />t-) <br />. <br />tZ:l <br />.... <br /> <br />Installation Cost Item Unit Amount PL-566 Funds Other Funds Total. <br /> $ Dollars $ Dollars $ Dollars <br />Management Practices <br />Irrigation Water Management AC 31,000 310,000 310,000 <br />Nutrient Management AC 31,000 465,000 465,000 <br />Pest Management AC 1,000 15,000 15,000 <br />Polyacrylamide 3/ AC 4,000 30,000 30,000 60,000 <br /> . <br />Subtotal (Management) 30,000 820,000 850,000 <br />Enduring Practices <br />Ditch Lining (Concrete) FT 270,000 911,250 911,250 1,822,500 <br />Gated Pipe FT 210,000 315,000 315,000 630,000 <br />Pipeline FT 405,000 1,215,000 1,215,000 2,430,000 <br />Land Leveling AC 9,800 1,715,000 1,715,000 3,430,000 <br />Water Control Structure fI 240 144,000 144,000 288,000 <br />Underground Drain FT 202,200 364,000 364,000 728,000 <br />Hydrants II 80 14,400 14,400 28,800 <br />Alfalfa Valves " 400 36,000 36,000 72,000 <br />Gated Pipe Surge " 25,600 38,400 38,400 76,800 <br />Surge Valve 11 80 66,000 66,000 132,000 <br />Feedlot pit 11 3 42,000 42,000 84,000 <br />Feedlot Diversion 1I 3 9,000 9,000 18,000 <br />Mitigation 50,000 50,000 100,000 <br />Subtotal (Enduring) 4,920,050 4,920,050 9,840,100 <br />Technical Assistance 2,952,000 2,952,000 <br />Administrative Costs 467,450 24,550 492,000 <br />Total Project 8,369,500 5,764,600 14,134,000 <br /> <br />1/ Price base 1996 <br />2/ All on nonfederal land <br />3/ Assume 50%-50% Cost Shared <br />