Laserfiche WebLink
<br />iH112~6 <br /> <br />. <br /> <br />CHAPTER IV <br /> <br />IMPROVEMENT AND EXTENSION <br /> <br />Major Conveyance Structures <br /> <br />Recommended for replacement or partial reconstruction <br /> <br /> Canal or Stream or <br /> Structure Lateral Location LenKth Capacity <br /> Siphon West Duckett Draw 100' 150 cfa <br /> Siphon West Dolores Creek 120' 150 cfs <br /> Siphon CQ Lateral Dry Creek 1420' 100 cfa <br /> Siphon CQ Lateral Dry Creek trib. 260' 100 cfs <br /> Siphon CQ Lateral Big Sandy Wash 350' 100 cfa <br /> Siphon Ironstone Wise Creek 580' 50 cfa <br />. Siphon Ironstone Buttermilk Cr. trib. 100' 25 cfs <br />Siphon Ironstone Buttemilk Cr. trib. 200' 25 cfs <br /> Flume West Uncompahgre River 850' 150 cfs <br /> Flume M&D Dry Creek 150' 100 cfs <br /> Flume Loutzenhizer Dry Cedar Cr. 150' 150 cfs <br /> Flume Loutzenhizer Cedar Creek 100' 150 cfa <br /> Flume Selig Loutzenhizer Arroyo 130' 150 cfa <br /> Tunnel South Parts of 5 tunnels 1000' 1000 cf s <br /> Tunnel West 1730' 150 cfs <br /> <br />. <br /> <br />49 <br />