Laserfiche WebLink
<br />C) <br />(....:> <br />N <br />l-,) <br />I-" <br />I-" <br /> <br />179 <br /> <br />For the simulations presented in Chapters 6 and 7 a target <br /> <br />discharge of 8.25 MAF/yr (10.17 km3/yr) was imposed upon Lake Mead. <br /> <br />This value was chosen so that the capabilities of Lakes Powell and <br /> <br />Mead in meeting equal target discharges might be compared. Simulations <br /> <br />were also performed using a Lake Mead target discharge of 7.0 MAF/yr, <br /> <br />the long range demand below Lake Mead. <br /> <br />The values of initial Lake Mead storage and total dissolved <br /> <br />solids concentration are set as they were for Lake Powell, and are <br /> <br />given in Table 5.11. <br /> <br />