Laserfiche WebLink
<br />- " <br /> <br />.-'" <br /> <br />}:e are presently working on a schedule which would have the permanent water <br />rights for the 19 wells and conditional water rights for the additional five <br />wells completed prior to the awarding of the construction contract for deep <br />well injection testing and construction which is presently scheduled for <br />the su~~er of 1983. <br /> <br />We feel that we have the support of the State Engineer and the Director of <br />the Colorado Water Conservation Board in resolving this water rights issue <br />on the Paradox Valley Unit. <br /> <br />f".~.(-~........,..1 <br />viti,'..... I...;. <br /> <br />~ <br /> <br />Mr. Jack Barnett <br />Executive Director <br />Colorado River Basin Salinity Control Forum <br />106 West 500 South <br />Suite 101 <br />Bountiful. Utah 84010 <br /> <br />~ -,-"'.ctl <br />!. b.::;;0l <br /> <br />2 <br /> <br />. <br /> <br />. <br /> <br />. <br />