My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00021
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:12:24 PM
Creation date
10/11/2006 9:28:58 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8281.980
Description
Colorado River Studies and Investigations - Upper Gunnison/Uncompahgre Basin Water Study
Basin
Gunnison
Water Division
4
Date
5/28/1987
Title
Phase I Feasibility Study For Upper Gunnison-Uncompahgre Basin -- Plan of Study -- Exhibit B
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r:, <br /> <br />TASK NO. 3 - ASSESS BASIN HYOROLOGY <br /> <br />4-14 <br />4-15 <br />4-17 <br />4-18 <br /> <br />, i <br />. ' <br /> <br />Subtask No. 3a: Prepare Streamflow and Water Rights <br />Data for Modeling <br />Subtask No. 3b: Prepare and Calibrate 8asin Model <br /> <br />(~_'~J <br /> <br />a,) <br />CJ't <br />"'l <br /> <br />TASK NO.4 - PROJECT DEMANDS <br /> <br />Subtask No. 4a: Forecast Population and Recreation Demand 4-19 <br />Subtask No. 4b: Forecast Agricultural Demands 4-20 <br />Subtask No. 4c: Forecast Municipal and Industrial Demand 4-21 <br />Subtask No. 4d: Review Power Forecast 4-22 <br />Subtask No. 4e: Review Out-of-Basin Water Needs 4-23 <br /> <br />TASK NO. 5 - IDENTIFY AND EVALUATE RECREATIONAL AND ENVIRONMENTAL 4-24 <br />PLAN COMPONENTS <br /> <br />Subtask No. Sa: Identify Potential Areas <br />Sub task No. 5b: Conduct Field Survey and Site Inventory <br />Sub task No. 5c: Instream Flow Enhancement for <br /> Fisheries and Recreation <br />Subtask No. 5d: Stream Access and Right-of-Way <br /> <br />4-25 <br />4-26 <br />4-27 <br />4-28 <br />4-29 <br /> <br />TASK NO.6 - COMPARE SUPPLY WITH, FORECASTED DEMANDS AND <br />INSTREAM FLOWS <br />TASK NO. 7 - SELECT PLAN EVALUATION/SCREENING CRITERIA <br /> <br />Subtask No. 7a: <br />Subtask No. 7b: <br />Sub task No. 7c: <br />Subtask No. 7d: <br /> <br />Technical Criteria <br />Economic Criteria <br />Environmental Criteria <br />Other Factors to Supplement Criteria <br /> <br />4-30 <br /> <br />4-31 <br />4-32 <br />4-33 <br />4-34 <br /> <br />4-35 <br /> <br />4-36 <br />4-37 <br />4-38 <br /> <br />4-39 <br /> <br />4-40 <br />4-41 <br />4-42 <br />4-44 <br />4-45 <br /> <br />TASK NO. 8 - NON-STRUCTURAL PLAN COMPONENTS <br /> <br />Subtask No. 8a: <br />Sub task No. 8b: <br />Subtask No. 8c: <br /> <br />Water Management <br />Institutional Measures <br />Screening of Alternatives <br /> <br />TASK NO. 9 - STRUCTURAL PLAN COMPONENTS <br /> <br />Subtask No. 9a: <br />Subtask No. 9b: <br />Subtask No. 9c: <br />Subtask No. 9d: <br />Subtask No. ge: <br /> <br />In-Basin Water Transfer Components <br />In-Basin Structural Components <br />Transmountain Diversion Components <br />Basin-Wide Hydropower Screening <br />Evaluate Plan Components <br />
The URL can be used to link to this page
Your browser does not support the video tag.