My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00016
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:12:22 PM
Creation date
10/11/2006 9:28:42 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.126.A
Description
San Miguel Project
State
CO
Basin
San Juan/Dolores
Water Division
4
Date
3/12/1973
Author
CWCB
Title
San Miguel Project
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />00 <br />~ <br />~ <br /> <br />has been constructed and is being operated by the Colorado-Ute Electric <br />Association. A potential for much greater energy production exists in <br />the area if adequate water supplies can be provided. <br /> <br />The principal economy of the area is based upon livestock pro- <br />duction and the associated growing of livestock feeds. The area is quite <br />arid and irrigation is necessary for the production of crops. Local <br />interest for the project has been very strong and persistent. <br /> <br />A major problem with the present plan of development is that the <br />project feasibility depends to a large extent upon the sale of water for <br />municipal and industrial purposes. A market for this type of water in <br />the area in the immediate future is doubtful, although such a market will <br />probably develop at some time in the future. In this respect, the project <br />faces a problem similar to that which faces the West Divide project. <br /> <br />Advance planning on the project up to this time has barely <br />progressed due to lack of funding. It is therefore recommended that <br />advance planning on the project be deferred until F.Y. 1976. For that <br />fiscal year, it is recommended that the sum of at least $200,000 be <br />sought to resume advance planning. <br /> <br />FLS:mm <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.